Archive | July/August

Continuous improvements lead to Maersk Oil Qatar’s longest horizontal well in the world

Posted on 03 November 2009 in 2009, Innovating While Drilling, July/August, The Offshore Frontier

Maersk Oil Qatar AS (MOQ) completed drilling the world-record BD-04A well in May 2008 offshore Qatar. It was the successful outcome of engineering…

PrintFriendlyShare This

Monobore wellbore design: Bangladesh exploration program highlights pros, cons

Posted on 03 November 2009 in 2009, Innovating While Drilling, July/August

“Monobore” describes A well where the diameter of the production conduit is uniform from the reservoir to surface. The simplest form of monobore is a string…

Market is way down, but North Sea companies are already warming up for the rebound

Posted on 03 July 2009 in 2009, Features, Global and Regional Markets, July/August

A year ago, with oil prices headed towards $150 a barrel, upstream petroleum appeared to be bucking the slide toward global recession that basically started…

Riser, subsea innovations push technical capabilities to new heights, but the work is never finished

Posted on 03 July 2009 in 2009, Features, July/August

When it comes to innovation, this industry is always hungry for more: deeper, faster, higher pressure, higher temperature, stronger, cheaper, smaller…

FEATURED MICROSITES


Recent Drilling News

  • 17 April 2014

    Shell makes deepwater gas discovery offshore Malaysia

    Shell has made an exploration discovery offshore Malaysia in the Rosmari-1 well located 135 km offshore Malaysia in Block SK318. The well was drilled to a total depth of 2,123...

  • 16 April 2014

    Maersk Drilling takes delivery of ultra-deepwater drillship

    Maersk Drilling has taken the delivery of its second drillship, Maersk Valiant from the Samsung Heavy Industries (SHI) shipyard in Geoje-Si, South-Korea. Maersk Valiant has begun its voyage toward the...

  • 16 April 2014

    Ensco orders new jackups from Lamprell

    Ensco has ordered two high-specification jackups, ENSCO 140 and ENSCO 141, for delivery in mid-2016 from Lamprell’s shipyard in the United Arab Emirates. The rigs will also...

  • 16 April 2014

    MPD/UBD successfully drills sidetrack after 6 failed conventional drilling attempts

    In the Brookeland Field in East Texas, conventional drilling methods failed in six attempts to drill a “straightforward” horizontal wellbore. The original well had surface casing installed...

  • 16 April 2014

    Chevron’s DGD training program serves array of learners across generations

    Since 2008, more than 400 people – from operators, drilling contractors, service companies and regulators – have completed Chevron’s dual-gradient drilling (DGD) training...

  • Read more news