Archive | March/April

D&C News

Posted on 12 March 2009 in 2009, Departments, March/April

Tullow Oil announced that the Tweneboa-1 exploration well, in the Deepwater Tano licence offshore Ghana, has discovered a significant highly pressured, light hydrocarbon accumulation…

PrintFriendlyShare This

D&C Tech Digest

Posted on 12 March 2009 in 2009, Departments, March/April

Helix Energy Solutions Group recently completed installation of drilling equipment on its MODU Q4000 multi-service vessel, equipped with a DP-3 system…

People, Companies & Products

Posted on 12 March 2009 in 2009, Departments, March/April

Apache chairman and CEO G Steven Farris has formed an office of the chief executive with three executives reporting to him: Roger B Plank, CFO since 1997…

Perspectives: David Reid, National Oilwell Varco

Posted on 12 March 2009 in 2009, Departments, IADC: Global Leadership, Global Challenges, March/April

In what David Reid calls the “inventing/creating world” in his head, there are definitive ideas about how things should be and strong opinions about right and wrong…

Oman training center supports safety, operational goals

Posted on 12 March 2009 in 2009, Departments, Drilling It Safely, March/April

The Nabors International Oman Training Center (OTC) in Muscat, which began operating 12 years ago, originally trained rig mechanics and electricians…

Innovations in MWD/LWD and drill pipe technologies address key operator concerns and needs, put previously impossible wells into reach

Posted on 12 March 2009 in 2009, Features, Innovating While Drilling, March/April

Operators ask for a lot in their logging-while-drilling (LWD) and measurement-while-drilling (MWD) tools. And why shouldn’t they, considering the sizable chunks these services can chew off of a budget?

Case study: Hostile-environment LWD allows efficient oil recovery in HPHT field

Posted on 12 March 2009 in 2009, Innovating While Drilling, March/April

In the deep, high-pressure, high-temperature wells in the Villafortuna/Trecate field in northern Italy, LWD was planned to enable continuous correlation for casing and coring points…

New litho neutron density tool features shorter length, wireless capability

Posted on 12 March 2009 in 2009, Innovating While Drilling, March/April

Aside from the GeoTap IDS, two new tools have been added to the InSite suite of technologies from Halliburton’s Sperry Drilling Services…

Acoustic telemetry, with multiple nodes in drillstring, used to achieve distributed MWD

Posted on 12 March 2009 in 2009, Innovating While Drilling, March/April

Unattended acoustic telemetry in real-time drilling environments can now include multiple nodes in the drillstring. We utilize a primary tool near the drill bit that transmits telemetry and sensor/directional information with one or more acoustic transponding devices at other sites along the drillstring, these incorporating both the primary signal and additional information from their own local sensors…

Along-string pressure, temperature measurements hold revolutionary promise for downhole management

Posted on 12 March 2009 in 2009, Innovating While Drilling, March/April

It’s widely known that the majority of stuck pipe incidents occur while pulling out of hole. If we can detect where an incident might occur – for example, in a 20,000-ft well – that could mean a radical reduction in nonproductive time (NPT) related to wellbore stability or drillstring integrity…

FEATURED MICROSITES


Recent Drilling News

  • 26 November 2014

    US EIA: Increase in energy demand requires 33 million bbl/day more oil

    The world is going to need one-third more oil between 2010 and 2040, with developing countries, such as China and India, accounting for a major portion in the increase in...

  • 25 November 2014

    Prescriptive Analytics prescribes how to complete wells to maximize production

    "Big data" is taking on a new role in industry, where companies are combining the findings from geology and geophysics with new data collected from advanced technologies...

  • 25 November 2014

    Petrobras completes drilling first appraisal well in Libra Consortium

    Petrobras recently completed drilling the first appraisal well in the Libra area, the 3-BRSA-1255 (3-RJS-731), known as NW1. Located in the Northwest portion of the Libra block, in the pre-salt layer of the...

  • 24 November 2014

    Ensign secures contracts for 2 ADR 1500S pad drill rigs in Montney area

    Ensign Energy Services has signed contracts for two of its new ADR 1500S pad drill rigs for a major operator in the Montney area of northeast British Columbia...

  • 21 November 2014

    Statoil cancels Stena Carron rig contract offshore Angola

    Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola...

  • Read more news