Archive | March/April

High-strength, thin-wall, all-steel drill pipe may provide solution for ultra-extended-reach wells

Posted on 12 March 2009 in 2009, Innovating While Drilling, March/April

In planning for ultra-extended-reach (uER) wells, projected torque & drag (T&D) loads exceed the capabilities of existing high-strength drill pipe. As operators continue to evaluate uER well options, they have been forced to consider using non-steel drill pipe materials (such as aluminum, titanium, composite or other) for reduced surface loads…

PrintFriendlyShare This

Lightweight, ultra-high-strength drill pipe may meet demands of ERD, critical deep drilling

Posted on 12 March 2009 in 2009, Innovating While Drilling, March/April

Current and future extended-reach drilling (ERD) and other critical projects exceed the capabilities of conventional steel S-135 drillstring assemblies…

Company taking aerospace alloys to oil/gas

Posted on 12 March 2009 in 2009, Innovating While Drilling, March/April

It’s estimated that less than 1% of the oil and gas market uses aluminum drill pipe (Al DP). Although there are many claimed benefits – primarily its lighter weight vs steel – the higher costs involved have generally confined the pipe to niche applications…

New technologies make well intervention faster, more accurate, cost-efficient, more reliable

Posted on 12 March 2009 in 2009, March/April

In a down market, at least one sector of the oil and gas industry is holding steady – the well intervention business. Some service providers even anticipate an uptick in business that could sustain for the next two years…

Review & update: Expandable technologies gain traction through accumulated experience

Posted on 12 March 2009 in 2009, Completing the Well, March/April

As expandable technology matures, it has become a larger part of the wellbore construction toolbox. Operators no longer see expandables as problem-solving contingency tools, in part because of service companies’ aggressive development…

Innovative, application-specific drill bit designs prove value, help operators set drilling records

Posted on 12 March 2009 in 2009, Innovating While Drilling, March/April

A well is successful as a result of a drill bit with the correct configuration and hydraulic performance for the particular application. Designing the wrong elements can lead to low penetration rates, inefficient hydraulics for hole cleaning, and wellbores that may not reach the operator’s objective…

Maersk Drilling launches Green Rig project

Posted on 12 March 2009 in 2009, Drilling It Safely, March/April

In the A.P. Moller – Maersk Group, the environmental strategic ambition is to pursue energy efficiency in daily operations, across all business units…

FEATURED MICROSITES


Recent Drilling News

  • 28 July 2014

    SDI completes 500th MagTraC MWD Ranging project

    Scientific Drilling International (SDI) has completed the 500th MagTraC MWD Ranging project. MagTraC was introduced in 1998 to target challenging applications...

  • 28 July 2014

    Modular offshore rig design reduces deployment costs

    William Jacob Management (WJM) has introduced an offshore rig design that reduces deployment costs and improves speed-to-market for upstream operations. The 3,000-hp...

  • 23 July 2014

    Halliburton promotes Jeff Miller to President

    Halliburton has promoted Jeff Miller to President and has appointed him to the Halliburton Board of Directors effective 1 August 2014. Mr Miller is currently the...

  • 23 July 2014

    Statoil resumes production on Njord A platform

    Statoil has resumed oil and gas production on the Njord A platform in the Norwegian Sea, after a major reinforcement of the platform structure. Production had been shut down...

  • 22 July 2014

    Petrobras’ domestic oil production tops 2 million bbl/day in June

    Petrobras’ June oil production in Brazil averaged 2 million bbl/day (bpd), a 1.7% increase from May’s production of 1.9 million bpd. In addition, the production operated...

  • Read more news