Archive | 2010

Concepts, misconceptions about kick tolerance

Posted on 08 November 2010 in 2010, Drilling It Safely, November/December

Even though kick tolerance is a critical and fundamental concept for the drilling industry, no standard is used by all operators and drilling contractors…

PrintFriendlyShare This

Deepwater moratorium is dead: But does Son of Moratorium still stalk the Gulf of Mexico?

Posted on 08 November 2010 in 2010, November/December

While the Gulf of Mexico deepwater drilling moratorium was lifted on 12 October, it remains unclear when drilling in water deep or shallow will return to anything like normal levels…

Wirelines

Posted on 08 November 2010 in 2010, IADC: Global Leadership, Global Challenges, November/December

IADC met with representatives from the Washington, DC, OSHA Directorate of Enforcement Programs on 16 August to seek clarification on the Enforcement Policy for Flame-Resistant Clothing…

70th Anniversary Retrospective

Posted on 08 November 2010 in 2010, IADC: Global Leadership, Global Challenges, November/December

IADC celebrates its 70th anniversary in 2010. In recognition of this milestone, and in anticipation of the decades ahead, DC is publishing retrospectives from issues of decades past…

Next-generation workers: hungry for experience, eager to learn and ready to prove themselves

Posted on 08 November 2010 in 2010, IADC: Global Leadership, Global Challenges, November/December, Videos

Contrary to what some industry veterans are worried about, young professionals today are not afraid of hard work…

UKCS drilling activity projected to stay stable in 2011, though underfunded wells could be damper

Posted on 08 November 2010 in 2010, November/December

As of late September, there had been 55 exploration & appraisal (E&A) well starts on the UK Continental Shelf (UKCS) in 2010…

Where simple is never simple, operators aim for simplicity in deepwater, deep-well completions

Posted on 08 November 2010 in 2010, Completing the Well, November/December

Applying completion technology to a well for optimal production is never simple, even if the plan calls for only “basic” temperature…

People, Companies & Products

Posted on 08 November 2010 in 2010, Departments, November/December

Baker Hughes has been awarded an eight-year contract extension from Repsol for the supply and maintenance of electrical submersible pumping…

2011 drilling outlook: 3 analysts, 3 takes

Posted on 08 November 2010 in 2010, Features, November/December

Held by production and joint venture spending in the shale basins have kept the US land rig count higher this year than you might expect, judging from natural gas prices, said James Wicklund, principal at Carlson Capital. But come 2011, industry will have to look to horizontal drilling in oily plays to keep the pace…

Shell drives down high-potential incidents with global dropped objects prevention campaign

Posted on 08 November 2010 in 2010, Drilling It Safely, Features, November/December

Safety is always our top priority. We aim to have zero fatalities and no incidents that harm people or put our neighbours or facilities at risk. When we analyzed the biggest risk areas in our wells operations…

FEATURED MICROSITES


Recent Drilling News

  • 27 January 2015

    Hess Corp announces 2015 capital, exploratory budget

    Hess Corp announced a 2015 capital and exploratory budget of $4.7 billion, a 16% reduction from its 2014 actual spend of $5.6 billion. Of this, $2.1 billion (45%) is budgeted for unconventional shale resources...

  • 26 January 2015

    Young professionals program at SPE/IADC Drilling Conference to target future leaders of the industry

    The oil and gas industry is constantly looking to the future. Whether this comes in the form of pushing the limits of pressure...

  • 22 January 2015

    Tullow Oil moves ahead with exploration, appraisal drilling onshore Kenya

    Tullow Oil has announced updates on several onshore projects in Kenya, including the Expir-1 exploration, Engomo-1 exploration, the Ngamia and Amosing...

  • 22 January 2015

    Petrobras reduces operating costs, time with new pre-salt subsea equipment deployment technique

    At the end of last year, Petrobras deployed its first wet Christmas tree using cables in the pre-salt area. The main change involved was the use of a subsea equipment...

  • 22 January 2015

    XACT, BP complete first deepwater deployment of SandSentry Acoustic Telemetry Network in Gulf of Mexico

    XACT Downhole Telemetry, in conjunction with BP, recently completed the first operational field trial of the SandSentry Acoustic Telemetry Network in the deepwater Gulf of Mexico...

  • Read more news