Archive | March/April

Special Event Coverage: 2010 Offshore Technology Conference

Posted on 28 April 2010 in 2010, Features, March/April

Founded in 1969, the Offshore Technology Conference is the world’s foremost event for the development of offshore resources in the fields of drilling, exploration, production, and environmental protection…

PrintFriendlyShare This

Perspectives: Dan Mueller, ConocoPhillips

Posted on 25 March 2010 in 2010, Departments, IADC: Global Leadership, Global Challenges, March/April

Cementing may be a small portion of the overall well construction cost, but its impact on the success or failure of a well is anything but, said Dan Mueller, cementing specialist for ConocoPhillips…

People, Companies & Products

Posted on 25 March 2010 in 2010, Departments, March/April

BJ Services has introduced the GEMINI system, a range of combo tools that provides caliper, metal loss and mapping information in a single tool. Unlike conventional combo tools, the new system uses an active speed control…

HSE Corner: Competent water management system will improve drinking water quality, protect employee health

Posted on 25 March 2010 in 2010, Departments, Drilling It Safely, March/April

There is an increasing awareness in the offshore drilling industry that safe and potable water is an important factor for good health onboard the rig. Many offshore platforms use bottled water for human consumption to ensure quality…

Offshore Technology Conference

Posted on 25 March 2010 in 2010, Departments, March/April

Studies consistently demonstrate that IADC members constitute a major portion of OTC registrants. IADC steadily ranks in the top three when registrants are asked to identify their association…

Drilling & Completions Tech Digest

Posted on 25 March 2010 in 2010, Departments, March/April

ExxonMobil has completed the first two extended-reach wells at the Odoptu field offshore eastern Russia. ExxonMobil subsidiary Exxon Neftegas Ltd (ENL) is operator on behalf of the five-company international Sakhalin-1 Consortium…

Drilling & Completions News

Posted on 25 March 2010 in 2010, Departments, March/April

Vantage Drilling named their new rig, the Topaz Driller, in late February at the PPL Shipyards. A Baker Marine Pacific-class 375 rig, the Topaz Driller will go to work for PVEP Phu Quy Petroleum Operating Company offshore Vietnam…

Drilling Ahead: To MPD or not to MPD? Simplifying daunting decisions

Posted on 25 March 2010 in 2010, Departments, March/April

To MPD or not to MPD? That is the question posed not by Hamlet, but by George Medley, Signa Engineering, speaking at the 2010 SPE/IADC Managed Pressure Drilling & Underbalanced Operations Conference in Kuala Lumpur in late February…

News Cuttings

Posted on 24 March 2010 in 2010, IADC: Global Leadership, Global Challenges, March/April

IADC president Dr Lee Hunt and operations assistant – Asia operations Chit Hlaing hosted a meeting with active operator and services companies in Yangon, Myanmar, in January…

Wirelines

Posted on 24 March 2010 in 2010, IADC: Global Leadership, Global Challenges, March/April

IADC and five other oilfield trade groups have written to the Obama Administration’s Ocean Policy Task Force urging extreme caution in pursuing marine spatial planning (MSP) as it may impact OCS oil and natural gas E&P…

FEATURED MICROSITES


Recent Drilling News

  • 26 November 2014

    US EIA: Increase in energy demand requires 33 million bbl/day more oil

    The world is going to need one-third more oil between 2010 and 2040, with developing countries, such as China and India, accounting for a major portion in the increase in...

  • 25 November 2014

    Prescriptive Analytics prescribes how to complete wells to maximize production

    "Big data" is taking on a new role in industry, where companies are combining the findings from geology and geophysics with new data collected from advanced technologies...

  • 25 November 2014

    Petrobras completes drilling first appraisal well in Libra Consortium

    Petrobras recently completed drilling the first appraisal well in the Libra area, the 3-BRSA-1255 (3-RJS-731), known as NW1. Located in the Northwest portion of the Libra block, in the pre-salt layer of the...

  • 24 November 2014

    Ensign secures contracts for 2 ADR 1500S pad drill rigs in Montney area

    Ensign Energy Services has signed contracts for two of its new ADR 1500S pad drill rigs for a major operator in the Montney area of northeast British Columbia...

  • 21 November 2014

    Statoil cancels Stena Carron rig contract offshore Angola

    Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola...

  • Read more news