Archive | May/June

Kids find joy in oil and gas

Posted on 04 May 2011 in 2011, Departments, May/June

“I never knew my Barbie came from petroleum,” the little girl wrote in amazed wonder. Likewise, the little boy…

PrintFriendlyShare This

A year after Macondo: the New World of drilling

Posted on 04 May 2011 in 2011, Features, May/June

“Much more stringent regulations and a more lengthy permit time – those are foregone conclusions. That’s part of the new normal … and the new normal won’t look anything like the old normal,” Gary Luquette, president of Chevron North America E&P, said…

Tide is turning on offshore drilling: Drilling contractors prepare for anticipated rise in activity, dayrates with newbuild orders

Posted on 04 May 2011 in 2011, Features, May/June

The tide is turning for offshore drilling. An outlook that six months ago was on a flat-to-downward trajectory is showing what many in the industry believe…

FEATURED MICROSITES


Recent Drilling News

  • 31 July 2014

    Eni discovers gas and condensates offshore Gabon

    Eni has made a gas and condensates discovery in the Nyonie Deep exploration prospect in block D4, approximately 13 km offshore Gabon and 50 km from the capital city Libreville...

  • 31 July 2014

    Blue Ocean Technologies: Subsea well intervention completed in 6,700- ft record depth

    Blue Ocean Technologies has set multiple records in subsea well intervention by intervening in, and subsequently plugging and abandoning, a production gas...

  • 30 July 2014

    Fugro’s DeepData pod provides data for deepwater riser monitoring

    Fugro has delivered a motion dataset from the BOP stack and lower riser of two deepwater wells in the Barents Sea using its DeepData pods. The DeepData pods...

  • 28 July 2014

    SDI completes 500th MagTraC MWD Ranging project

    Scientific Drilling International (SDI) has completed the 500th MagTraC MWD Ranging project. MagTraC was introduced in 1998 to target challenging applications...

  • 28 July 2014

    Modular offshore rig design reduces deployment costs

    William Jacob Management (WJM) has introduced an offshore rig design that reduces deployment costs and improves speed-to-market for upstream operations. The 3,000-hp...

  • Read more news