Archive | September/October

QHSE lift: redefining management systems

Posted on 21 September 2011 in 2011, Drilling It Safely, September/October

To many people a management system, whether HSE, finance, human resources or operations, is a collection of documents describing “things the company needs or wants …

PrintFriendlyShare This

Re-inventing subsea intervention to keep economics above water

Posted on 21 September 2011 in 2011, Completing the Well, Features, September/October

Ten thousand feet below the platform, a well production tree, with all its pipes, manifolds and production lines, is signaling yet another new frontier in hydrocarbon …

Australia embarks on coal seam gas, the next E&P frontier Down Under

Posted on 21 September 2011 in 2011, Features, Global and Regional Markets, September/October

A steady producer of oil and gas in conventional onshore and offshore fields, Australia is looking to new and unconventional resources to chart its future …

Optimizing ROP through automation

Posted on 21 September 2011 in 2011, Drilling Rigs & Automation, September/October

Increasing the rate of penetration without detrimentally affecting hole quality or well placement can help to reduce drilling costs, especially on rigs with a…

Dual BOPs: When one just isn’t enough

Posted on 21 September 2011 in 2011, Drilling Rigs & Automation, Features, September/October

On 1 June Rowan Companies announced it had ordered the first two ultra-deepwater drillships in the company’s history, to be built by Hyundai Heavy Industries in South Korea. These 12,000-ft capable vessels will each be equipped…

Rig mobility on the fast track

Posted on 21 September 2011 in 2011, Drilling Rigs & Automation, Features, September/October

Rig manufacturers are expanding the operating and mobility features of the industry’s rigs to a new level of sophistication – the highly or ultra-mobile rig …

HIL merges risk-free testing, virtual drilling

Posted on 21 September 2011 in 2011, Drilling Rigs & Automation, September/October

The devil is in the details. For today’s state-of-the-art rigs and increasingly automated drilling equipment, that translates to the software…

Shedding light on electrical simplicity

Posted on 21 September 2011 in 2011, Drilling Rigs & Automation, September/October

Simpler power distribution systems are being cited as the reason for a reduction in blackout scenarios aboard deepwater rigs. Isolated at sea, deepwater drillships …

From islands to clouds: the data evolution

Posted on 21 September 2011 in 2011, Drilling Rigs & Automation, September/October

As rig mechanization and automation become more demanding and complex, it is vital that existing and prospective communication technologies …

Maintenance history materializes with RFID

Posted on 21 September 2011 in 2011, Drilling Rigs & Automation, September/October

Radio-frequency identification (RFID) has become a key ingredient to increase reliability in the drilling industry. It is one of the only industries where RFID …

FEATURED MICROSITES


Recent Drilling News

  • 25 November 2014

    Prescriptive Analytics prescribes how to complete wells to maximize production

    "Big data" is taking on a new role in industry, where companies are combining the findings from geology and geophysics with new data collected from advanced technologies...

  • 25 November 2014

    Petrobras completes drilling first appraisal well in Libra Consortium

    Petrobras recently completed drilling the first appraisal well in the Libra area, the 3-BRSA-1255 (3-RJS-731), known as NW1. Located in the Northwest portion of the Libra block, in the pre-salt layer of the...

  • 24 November 2014

    Ensign secures contracts for 2 ADR 1500S pad drill rigs in Montney area

    Ensign Energy Services has signed contracts for two of its new ADR 1500S pad drill rigs for a major operator in the Montney area of northeast British Columbia...

  • 21 November 2014

    Statoil cancels Stena Carron rig contract offshore Angola

    Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola...

  • 19 November 2014

    Stepwise approach guides Statoil’s North American onshore path

    When Statoil entered the North American onshore industry in 2008, it was a non-operator in a joint venture (JV) with Chesapeake in one shale play. Since then, Norwegian-based…

  • Read more news