Archive | January/February

2013 IADC/SPE Drilling Conference: Exclusive roundup of abstracts from 18 technical sessions

Posted on 21 February 2013 in 2013, IADC/SPE Drilling Conference, IADC: Global Leadership, Global Challenges, January/February

Exclusive roundup of abstracts from 18 technical sessions…

PrintFriendlyShare This

Autonomous hull-cleaning system delivered for US Navy testing

Posted on 31 January 2013 in 2013, Drilling It Safely, January/February, News, The Offshore Frontier

SeaRobotics Corp has delivered the first HullBUG (Hull Bio-inspired Underwater Grooming) system to the Center for Corrosion and Biofouling Control at the Florida…

Wirelines

Posted on 30 January 2013 in 2013, IADC: Global Leadership, Global Challenges, January/February

The US EPA’s decision to ban BP from bidding in future offshore US lease sales could…

John Beswick, PR Marriott Drilling: Politics could hinder Euro-shale potential

Posted on 30 January 2013 in 2013, Departments, January/February

John Beswick, director of PR Marriott Drilling, grew up wanting to be a pilot…

2013 IADC Officers

Posted on 30 January 2013 in 2013, IADC: Global Leadership, Global Challenges, January/February

David Williams was named chairman, president and chief executive officer of Noble Corp in January 2008…

Personal responsibility for safety a must for incident-free workplace

Posted on 30 January 2013 in 2013, Drilling It Safely, January/February

Industry increasingly looks to non-traditional geographies, disciplines for workers, enhancing safety through strong corporate culture…

Tailored engineering, automation to drive optimized fracturing

Posted on 30 January 2013 in 2013, Completing the Well, January/February, Onshore Advances

Rush into manufacturing mode may be leading to less efficient frac designs, forfeiting valuable information, production in shales. If you look at the estimated…

Advanced technology on simple wells puts focus on performance

Posted on 30 January 2013 in 2013, Drilling Rigs & Automation, Innovating While Drilling, January/February, Onshore Advances

Applying same drilling practices to both complex and basic wells builds skills, capability, can reduce overall costs if done right. In 2012, we drilled about 2,500…

Risk-based approach to competency places focus on rig floor, well control

Posted on 30 January 2013 in 2013, Drilling It Safely, January/February

Contractors expanding safety management systems to formalize stronger process safety components. For the majority of drilling contractors…

Plenary session to explore impact of stakeholders’ growing expectations, heightened public awareness

Posted on 30 January 2013 in 2013, Features, IADC: Global Leadership, Global Challenges, January/February

The 2013 SPE/IADC Drilling Conference and Exhibition, 5-7 March in Amsterdam, will provide leading industry thinkers…

FEATURED MICROSITES


Recent Drilling News

  • 31 October 2014

    Japan Drilling to operate new jackup under construction at Keppel

    The KFELS Super B Class design has a drilling depth of 35,000 ft. The rig's leg structure is designed to provide enhanced robustness for operations at 400 ft water depth...

  • 29 October 2014

    New intelligent water management solution based on oxidizer technology

    Nalco Champion has launched the RenewIQ line of oilfield water reuse solutions to help operators reduce freshwater consumption and associated handling costs...

  • 29 October 2014

    Baker Hughes launches all-electric intelligent well system

    Baker Hughes has commercially released its MultiNode all-electric intelligent well system. It allows operators to remotely monitor and control a greater number of production zones...

  • 29 October 2014

    Tercel collaborates with TOTAL to design MicroCORE PDC drill bit

    Tercel Oilfield Products has launched the MicroCORE cutting system at the 2014 SPE Annual Technical Conference and Exhibition in Amsterdam. The MicroCORE cutting...

  • 28 October 2014

    First extension well in pre-salt Libra leads to oil discovery

    The Libra consortium announced that the drilling of the first extension well in the Libra area, known as 3-BRSA-1255-RJS (3-RJS-731), has proven the discovery of high-quality oil...

  • Read more news