Archive | March/April

Real-time capabilities, inspection systems fine-tune coiled tubing

Posted on 18 March 2013 in 2013, Innovating While Drilling, March/April

Improvements in coiled-tubing (CT) data acquisition are sharpening the eyes and ears of downhole operations, as real-time data allows operators to better monitor…

PrintFriendlyShare This

Emergency response: Industry builds an equipped community

Posted on 18 March 2013 in 2013, Drilling It Safely, March/April

Breakthroughs in exploration technologies have opened up opportunities of historic proportions, but they have also brought new liabilities and…

News Cuttings

Posted on 18 March 2013 in 2013, Departments, March/April

IADC presented Mike Hoyle, head of advanced engineering in GL Noble Denton’s UK marine and offshore operation…

People, companies and products

Posted on 18 March 2013 in 2013, Departments, March/April

Aker Solutions has signed a contract with Statoil for the supply of a subsea production system for the Aasta Hansteen field…

Environment and drilling: It’s not one or the other

Posted on 18 March 2013 in 2013, Features, March/April

Like the path that has been taken to achieve safer operations, industry has come a long way in improving its environmental performance, taking incremental steps that are adding up to significant change…

IADC introduces the Red Thread

Posted on 18 March 2013 in 2013, March/April

With president and CEO Stephen Colville at the helm, IADC recently introduced the Red Thread, an accordion-style document and HTML5 app that details how IADC will achieve its core goal of catalyzing improved performance for the drilling industry…

Fuel management system opens window to engine usage, reduces fuel requirements, emissions

Posted on 28 February 2013 in 2013, Drilling Rigs & Automation, March/April, News, Onshore Advances

In the ongoing push for more rig automation, Canrig Drilling Technology has developed a computer-based fuel management…

FEATURED MICROSITES


Recent Drilling News

  • 26 November 2014

    US EIA: Increase in energy demand requires 33 million bbl/day more oil

    The world is going to need one-third more oil between 2010 and 2040, with developing countries, such as China and India, accounting for a major portion in the increase in...

  • 25 November 2014

    Prescriptive Analytics prescribes how to complete wells to maximize production

    "Big data" is taking on a new role in industry, where companies are combining the findings from geology and geophysics with new data collected from advanced technologies...

  • 25 November 2014

    Petrobras completes drilling first appraisal well in Libra Consortium

    Petrobras recently completed drilling the first appraisal well in the Libra area, the 3-BRSA-1255 (3-RJS-731), known as NW1. Located in the Northwest portion of the Libra block, in the pre-salt layer of the...

  • 24 November 2014

    Ensign secures contracts for 2 ADR 1500S pad drill rigs in Montney area

    Ensign Energy Services has signed contracts for two of its new ADR 1500S pad drill rigs for a major operator in the Montney area of northeast British Columbia...

  • 21 November 2014

    Statoil cancels Stena Carron rig contract offshore Angola

    Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola...

  • Read more news