Archive | 2014

Rolling PDC cutter enhances drill bit life in Granite Wash runs

Posted on 10 July 2014 in 2014, Global and Regional Markets, Innovating While Drilling, July/August

Recent advances in diamond bonding techniques and manufacturing processes have enabled the industry to produce highly abrasion-resistant polycrystalline diamond cutters…

PrintFriendlyShare This

Automated well control: Industry gets ready for 20,000 psi and beyond

Posted on 10 July 2014 in 2014, Drilling It Safely, July/August

The drilling industry continues to push the limits of its technologies in order to access deeper, hotter, higher-pressure reservoirs. As the industry moves toward drilling…

A fluid situation

Posted on 10 July 2014 in 2014, CurrentFeatures, Innovating While Drilling, July/August

The complexities of today’s oil and gas reservoirs demand new levels of sophistication for drill fluids, including fluids that improve lubricity and reduce risk and environmental impact…

Risk-informed decisions allow realization of rigs’ inherent reliability

Posted on 10 July 2014 in 2014, Drilling It Safely, July/August, The Efficient Rig

Drilling rig operation, maintenance and management involves fast turnaround and high-pressure work with critical tasks. These tasks are performed by diversely skilled personnel…

Real-time drilling service halts twist-offs in Wolfcamp wells

Posted on 10 July 2014 in 2014, Innovating While Drilling, July/August, Onshore Advances

An operator in the Permian Basin requested Baker Hughes to provide a real-time drilling performance service due to numerous drill string twist-offs occurring on both…

Q&A’s with UK, Norwegian regulators

Posted on 10 July 2014 in 2014, Drilling It Safely, Global and Regional Markets, July/August, The Offshore Frontier

As head of the UK Heath and Safety Executive (HSE) Energy Division, what goals do you have for the coming years? Susan Mackenzie: The health and safety priorities for the…

Expandable liner gets deepwater well to TD past 3 sand zones

Posted on 10 July 2014 in 2014, Completing the Well, July/August, The Offshore Frontier

Deep and ultra-deepwater exploration activities continue to set records as new wells are drilled in deeper waters and in more complex reservoirs. At the same time, the…

Front-loaded approach to well control stresses planning, prevention

Posted on 10 July 2014 in 2014, Drilling It Safely, Innovating While Drilling, July/August, Onshore Advances, The Offshore Frontier

An ounce of prevention is worth a pound of cure. Benjamin Franklin’s sage advice still resonates today, even in 10,000-ft laterals and subsea wells a mile or more beneath…

Editorial: Tools to improve performance are there, but it’s up to the industry to use them

Posted on 10 July 2014 in 2014, IADC: Global Leadership, Global Challenges, July/August

The industry believes it’s on top of its game, but that is far from what the public feels. This was stated by Kevin Lacy while speaking on a panel session at the recent…

People, companies and products

Posted on 10 July 2014 in 2014, Departments, July/August

Alden James “Doc” Laborde, an offshore drilling pioneer who transformed the drilling industry with innovations that made it possible to drill farther and in deeper waters…

FEATURED MICROSITES


Recent Drilling News

  • 28 July 2014

    SDI completes 500th MagTraC MWD Ranging project

    Scientific Drilling International (SDI) has completed the 500th MagTraC MWD Ranging project. MagTraC was introduced in 1998 to target challenging applications...

  • 28 July 2014

    Modular offshore rig design reduces deployment costs

    William Jacob Management (WJM) has introduced an offshore rig design that reduces deployment costs and improves speed-to-market for upstream operations. The 3,000-hp...

  • 23 July 2014

    Halliburton promotes Jeff Miller to President

    Halliburton has promoted Jeff Miller to President and has appointed him to the Halliburton Board of Directors effective 1 August 2014. Mr Miller is currently the...

  • 23 July 2014

    Statoil resumes production on Njord A platform

    Statoil has resumed oil and gas production on the Njord A platform in the Norwegian Sea, after a major reinforcement of the platform structure. Production had been shut down...

  • 22 July 2014

    Petrobras’ domestic oil production tops 2 million bbl/day in June

    Petrobras’ June oil production in Brazil averaged 2 million bbl/day (bpd), a 1.7% increase from May’s production of 1.9 million bpd. In addition, the production operated...

  • Read more news