CATEGORIZED | News

Atwood Aurora delivered from Texas yard

Posted on 06 January 2009

The unit was built to the LeTourneau Super 116E design, with leg lengths of 477 ft that can be upgraded to 511 ft. It is capable of drilling wells up to 30,000 ft deep in water depths of 350 ft.

 

 

Leave a Reply

*

FEATURED MICROSITES


Recent Drilling News

  • 21 April 2015

    MPD is a good well control tool, but questions remain

    Experts agree that MPD offers better well control than conventional methods, but questions remain as to who is in charge and dealing with gas in the riser above the BOP...

  • 20 April 2015

    ExxonMobil exec calls for urgent action on US LNG exports

    The US may be at risk of losing economic opportunity and the ability to solidify its role as a global leader in energy production – unless the government moves to approve liquefied natural gas (LNG) exports...

  • 20 April 2015

    Kongsberg simulators selected to enhance training in Mexico

    FIDENA, on behalf of Mexico’s SCT has selected Kongsberg Maritime offshore simulators for the Marine Education Center in Ciudad del Carmen, Campeche...

  • 15 April 2015

    DNV introduces steel forgings RP to increase subsea standardization

    Steel forgings are important building blocks for subsea components and are often tailored to meet end-users’ specific requirements. This results in long delivery times...

  • 14 April 2015

    BSEE issues proposed BOP, well control regulations for public comment

    On 13 April, US Secretary of the Interior Sally Jewell announced proposed regulations that call for more stringent design requirements and operational...

  • Read more news