Baker Hughes Cytadel packer provides extra pressure barrier

Posted on 12 May 2014

YouTube Preview Image

Mark Knebel, Product Line Manager for Baker Hughes’ Wellbore Integrity and Specialty Services, introduces the Cytadel packer in this exclusive video with DC. The packer, launched last week at the 2014 OTC in Houston, has been deployed on two wells offshore Sakhalin Island, where fluid loss to the formation during cementing operations is an ongoing issue. Watch the video to learn more about the packer’s design and application.

Click here to read more about the packer in the May/June issue of Drilling Contractor.

Leave a Reply

*

FEATURED MICROSITES


Recent Drilling News

  • 23 July 2014

    Halliburton promotes Jeff Miller to President

    Halliburton has promoted Jeff Miller to President and has appointed him to the Halliburton Board of Directors effective 1 August 2014. Mr Miller is currently the...

  • 23 July 2014

    Statoil resumes production on Njord A platform

    Statoil has resumed oil and gas production on the Njord A platform in the Norwegian Sea, after a major reinforcement of the platform structure. Production had been shut down...

  • 22 July 2014

    Petrobras’ domestic oil production averages 2.8 million bbl/day in June

    Petrobras’ June oil production in Brazil averaged 2.8 million bbl/day (bpd), a 1.7% increase from May’s production of 1.9 million bpd. In addition, the production operated...

  • 22 July 2014

    Precision, Schlumberger partner to boost industrialization of North American unconventional drilling

    Precision Drilling has entered into a strategic technology and service agreement and marketing alliance with Schlumberger. Utilizing Precision’s Tier 1 drilling rigs and...

  • 22 July 2014

    Easternwell to manage delivery of onshore servicing rig for Brunei

    Australia’s Easternwell, a subsidiary of Transfield Services, has expanded internationally through an agreement with Flux O.S. SDN BHD (Flux), a Bruneian oil and gas company...

  • Read more news