Baker Hughes Cytadel packer provides extra pressure barrier

Posted on 12 May 2014

YouTube Preview Image

Mark Knebel, Product Line Manager for Baker Hughes’ Wellbore Integrity and Specialty Services, introduces the Cytadel packer in this exclusive video with DC. The packer, launched last week at the 2014 OTC in Houston, has been deployed on two wells offshore Sakhalin Island, where fluid loss to the formation during cementing operations is an ongoing issue. Watch the video to learn more about the packer’s design and application.

Click here to read more about the packer in the May/June issue of Drilling Contractor.

Leave a Reply

*

FEATURED MICROSITES


Recent Drilling News

  • 22 April 2015

    Transocean appoints Jeremy D. Thigpen as President & CEO

    Transocean has announced that Jeremy D. Thigpen has been named President and Chief Executive Officer effective 22 April 2015. Mr Thigpen succeeds Ian C. Strachan, Interim...

  • 22 April 2015

    Noted broadcast journalist Eithne Treanor to MC IADC World Drilling 2015, Rome, 17-18 June

    IADC is pleased to announce that noted industry broadcast journalist and professional moderator Eithne Treanor will serve as master of ceremonies...

  • 22 April 2015

    UBO & MPD Committee drives safe practices, while survey indicates industry moving toward acceptance

    The IADC Underbalanced Operations & Managed Pressure Drilling Committee continues to drive safe practices...

  • 22 April 2015

    Video: Schlumberger’s At Balance brand aims to make MPD more accessible

    Schlumberger recently brought back the At Balance brand as a family of product and services offering at the 2015 IADC/SPE Managed Pressure Drilling and Underbalanced...

  • 21 April 2015

    Petrobras’ first MPD operation aboard a DP rig succeeds

    Petrobras’ first use of MPD aboard a dynamically positioned rig proved successful and kept NPT to less then 3%, according to a paper presented at the 2015 IADC/SPE...

  • Read more news