CATEGORIZED | News

CAODC 2010 sees smaller Canadian fleet in 2010

Posted on 29 October 2009

 The Canadian Association of Oilwell Drilling Contractors anticipates a continued decline in the size of the Canadian fleet in 2010, due to equipment moving internationally and retiring. CAODC forecasts an average 800-rig fleet, down from 862 in the first Quarter 2009 and 840 in the fourth. The fleet peaked in December 2007 at 902 rigs.

On the other hand, average active rig count is expected to increase a bit, to 218 in 2010, a 4% change, up from 209 in 2009. Further, drilling days will increase bay about 4,000 to 78,480. Most of the increase, CAODC says, will be in the third quarter, with further slight pick up in the fourth quarter.

Only 40% of the fleet will be employed during the winter drilling season in the first quarter. An overall 27% utilization is expected next year.

“This will be the third year of sub-economic conditions, and at 27% is very close to the previous all-time low observed in 1992,” CAODC says.

The forecast assumes $5.50/Mcf gas and $70 oil. Activity levels are expected to be strongest in British Columbia and Saskatchewan.

Leave a Reply

*

FEATURED MICROSITES


Recent Drilling News

  • 22 April 2014

    Noble names Steven Manz as Senior VP And CFO of Paragon Offshore

    Steven A. Manz will serve as Senior VP and CFO of Noble Corp’s spinoff company Paragon Offshore, a standard specification offshore drilling company, Noble announced today...

  • 17 April 2014

    Shell makes deepwater gas discovery offshore Malaysia

    Shell has made an exploration discovery offshore Malaysia in the Rosmari-1 well located 135 km offshore Malaysia in Block SK318. The well was drilled to a total depth of 2,123...

  • 16 April 2014

    Maersk Drilling takes delivery of ultra-deepwater drillship

    Maersk Drilling has taken the delivery of its second drillship, Maersk Valiant from the Samsung Heavy Industries (SHI) shipyard in Geoje-Si, South-Korea. Maersk Valiant has begun its voyage toward the...

  • 16 April 2014

    Ensco orders new jackups from Lamprell

    Ensco has ordered two high-specification jackups, ENSCO 140 and ENSCO 141, for delivery in mid-2016 from Lamprell’s shipyard in the United Arab Emirates. The rigs will also...

  • 16 April 2014

    MPD/UBD successfully drills sidetrack after 6 failed conventional drilling attempts

    In the Brookeland Field in East Texas, conventional drilling methods failed in six attempts to drill a “straightforward” horizontal wellbore. The original well had surface casing installed...

  • Read more news