CATEGORIZED | News

CAODC 2010 sees smaller Canadian fleet in 2010

Posted on 29 October 2009

 The Canadian Association of Oilwell Drilling Contractors anticipates a continued decline in the size of the Canadian fleet in 2010, due to equipment moving internationally and retiring. CAODC forecasts an average 800-rig fleet, down from 862 in the first Quarter 2009 and 840 in the fourth. The fleet peaked in December 2007 at 902 rigs.

On the other hand, average active rig count is expected to increase a bit, to 218 in 2010, a 4% change, up from 209 in 2009. Further, drilling days will increase bay about 4,000 to 78,480. Most of the increase, CAODC says, will be in the third quarter, with further slight pick up in the fourth quarter.

Only 40% of the fleet will be employed during the winter drilling season in the first quarter. An overall 27% utilization is expected next year.

“This will be the third year of sub-economic conditions, and at 27% is very close to the previous all-time low observed in 1992,” CAODC says.

The forecast assumes $5.50/Mcf gas and $70 oil. Activity levels are expected to be strongest in British Columbia and Saskatchewan.

Leave a Reply

*

FEATURED MICROSITES


Recent Drilling News

  • 31 March 2015

    ExxonMobil begins production at Hadrian South in Gulf of Mexico

    ExxonMobil has begun production in the deepwater Gulf of Mexico (GOM) at Hadrian South, with facilities tied back to the nearby Lucius project. Daily gross production...

  • 31 March 2015

    Active risk assessment, global sharing at core of Nabors safety intervention program

    Gagan Singhal, Area Manager at Nabors Drilling International, outlined a new safety intervention system that helps the company...

  • 30 March 2015

    National Petroleum Council: US can safely tap Arctic resources to secure energy needs

    Prudently developing US Arctic oil and natural gas resources would enhance America’s position as a global leader in energy production for the next 35 years...

  • 30 March 2015

    Joint safety improvement plan aligns HSE objectives, “language” for Shell, Halliburton

    Speaking at a joint presentation with Halliburton at the 2015 IADC HSE&T Asia Pacific Conference in Kuala Lumpur on 12 March, Alain Moonen...

  • 27 March 2015

    Gravity-deployed carbon composite cable completes first commercial deployment offshore Norway

    Ziebel, a Stavanger-based provider of specialist well intervention services for the oil and gas industry, announced that its Z-Line gravity-deployed...

  • Read more news