CATEGORIZED | News

Company news

Posted on 04 February 2010

High-temperature expandable system installed in SAGD well

Enventure Global Technology announced this week the installation of its SET high-temperature cased-hole expandable system in a steam-assisted gravity drainage (SAGD) well in Alberta, Canada.

The 9 5/8 in.-by-11 3/4 in. high-temperature system was used to repair a casing integrity issue in the well. The 30-ft liner was installed and expanded at a depth of 646 ft (197 m) and allowed the operator to continue using the well.

“High-temperature conditions, like those in SAGD wells, place extreme stress on casing and pipe because of the cyclical nature of the steam injection process,” said Greg Noel, Enventure product commercialization manager. “Our system repaired the casing so the operator could avert the high cost of re-drilling the well.”

The new expandable system comes in all of the currently available SET sizes. It is rated to withstand temperatures up to 518°F (270°C) at pressures of 1,000 psi. As is the advantage with all expandable technology, the in-situ expansion of the steel casing allows for maximized internal diameter and throughput.

CROSCO's 900-hp Skytop 3 Rig built for Bankers Petroleum Albania.

CROSCO's 900-hp Skytop 3 Rig built for Bankers Petroleum Albania.

Crosco Skytop 3 begins drilling in Albania

CROSCO Integrated Drilling & Well Services has commenced drilling services for Bankers Petroleum Albania on the Patos Marinza oil field with the 900-hp Skytop 3 rig. Crosco subsidiary Rotary Pumping has been providing cementing services for Banker Petroleum since 2008, but this marks the return of Crosco’s drilling services to Albania.

FMC, Petrobras ink deal to deliver subsea trees

FMC Technologies has signed a four-year subsea tree frame agreement with Petrobras that is expected to result in approximately $400 million in revenue for FMC. The scope of supply includes the manufacture of up to 107 subsea trees and related tools designed for use offshore Brazil in water depths of 6,500 ft (2,000 m). All systems and equipment will be engineered and manufactured in Rio de Janeiro. Deliveries are scheduled to commence in 2012.

0 Comments For This Post

2 Trackbacks For This Post

  1. Company news | Drilling Contractor | albania News Station Says:

    [...] post: Company news | Drilling Contractor Share and [...]

  2. Company news | Drilling Contractor | Albania News BaVaBa Says:

    [...] is the original post: Company news | Drilling Contractor Share and [...]

Leave a Reply

*

FEATURED MICROSITES


Recent Drilling News

  • 02 September 2014

    FMC vocational technical training recognizes importance of non-technical skills

    The oilfield service business is a people business, and when you deal with human beings, there are no absolutes. In the world of vocational technical training, this means...

  • 28 August 2014

    DNV GL launches interactive Arctic risk map

    DNV GL has developed an interactive Arctic Risk Map to present the risks associated with offshore and maritime activities in the Arctic. The map aims to provide stakeholders...

  • 27 August 2014

    Video: Aviation safety program encourages employees to voluntarily report safety issues

    Since 2009, there have been no passenger fatalities on domestic airlines in the US, Ronny “Ronoo” Monsour, VP of Sales for Check-6, said. Mr Monsour also a pilot for...

  • 27 August 2014

    Vestigo Petroleum plans ‘manufacturing approach’ to marginal fields offshore Malaysia

    Vestigo Petroleum, a wholly owned subsidiary of Malaysian NOC Petronas Carigali, is about to put a tender out for its first rig on a first drilling program offshore...

  • 27 August 2014

    Case study from mining: Image-driven safety campaign removes communication barriers

    In the world of process safety, people, equipment, the environment and reputation are some of industry’s greatest assets, Marlane Kayfes, Senior Technical Writer...

  • Read more news