January/February 2011

 Critical Issues in Drilling and Completions

Exclusive Q&A’s with industry leaders
by Linda Hsieh, managing editor; Diane Langely, editorial coordinator; Jerry Greenberg and Katie Mazerov, contributing editors

 Completions

Intelligent wells: It’s not all or nothing
by Katie Mazerov, contributing editor

 Health, Safety, Environment & Training

EXCLUSIVE WEB CONTENT
How to ensure H2S safety on offshore rigs
by Angelo Pinheiro, Marathon Oil
Study: Employees intervene in only 2 of 5 observed unsafe acts
by Ron D. Ragain, Phillip Ragain, Mike Allen & Michael Allen, The RAD Group
For sustainable safety, leaders must do more coaching, less policing
by Shawn M. Galloway, Proact Safety

 Regional Focus: Asia Pacific

No slump in sight for Asia Pacific drilling
by Diane Langley, editorial coordinator

 Drilling & Completions

No more silos: Drilling optimization requires integrated workflow
by Jerry Greenwood, Rick Russell and James Bement, Halliburton

 2011 SPE/IADC Drilling Conference Special

Conference theme is ‘Being the best – growing our business’
by Diane Langley, editorial coordinator
Exclusive roundup of abstracts from 18 technical sessions and eight e-poster sessions

 IADC Connection

2010 IADC Contractor of the Year Scott Gordon: honored to serve the industry
by Linda Hsieh, managing editor
From the Chairman:Leadership, not politics
2011 IADC Officers
2011 IADC Chairman: Walk the walk on safety
Wirelines/News Cuttings

 Departments

Drilling Ahead: Strong oil prices, enabling technology drive expansion
D&C News
D&C Tech Digest
HSE Corner: How to gain the upper hand in finger, hand safety: 10 tips from the industry
by Diane Langley, editorial coordinator
People, Companies and Products
Perspectives: Cary Momjian, Ensco plc

FEATURED MICROSITES


Recent Drilling News

  • 17 December 2014

    Saudi Aramco: Four factors for a sustainable drilling business

    Despite the modest growth in demand and drop in oil prices today, the long-term outlook for industry is healthy. “Our industry will need to add around 40 million bbl per day for new capacity...

  • 16 December 2014

    Ensco development program produces driller in 3 years

    Ensco’s Accelerated Development Program (ADP) takes a “green” individual and, within a three-year period, trains them to become a driller. In response to personnel shortages in various areas, including drilling...

  • 16 December 2014

    Saudi Aramco: ‘Industry cannot afford to lose talent when the economy is down’

    Industry is facing a human resources challenge in two areas: the ageing workforce and the shortage of skills, Mohammed Al Sellemi...

  • 16 December 2014

    Nanotechnology has potential to improve tool performance in extreme environments

    In terms of temperature stability and corrosion, tools have limitations, especially in extremely challenging drilling environments. Jothibasu Ramasamy...

  • 16 December 2014

    Colville: WCI provides forum to evaluate practical, economical advances in well control practices

    Major players throughout industry are joining forces under the Well Control Institute (WCI). The mandate of WCI is “to provide the definitive forum...

  • Read more news