May/June 2009

 ONSHORE DRILLING

US land drillers wait out the painful market slump, hopeful of strong recovery
by Linda Hsieh, assistant managing editor
New-concept land rig design based on parallel operations
by Frank Springett, National Oilwell Varco
Technology briefs: Land drilling innovations

 OFFSHORE DRILLING

In Gulf of Mexico, deepwater and Shelf markets face disparate futures
by Jerry Greenberg, contributing editor
The perfect storm: Offshore drillers adjust to changing environment
by Tom Kellock, ODS-Petrodata
Micro-flux control, E-CD continuous circulation valves allow operator to reach HPHT reservoirs
by Angelo Calderoni, ENI, et al
Design criteria, planning critical for deepwater well testing in HPHT developments
by Hercilio P.S. Filho, Petrobras, et al

 BRAZIL

Despite global recession, Petrobras pushes ahead to develop pre-salt discoveries
by Jeremy Cresswell, contributing editor
Shallow water projects gaining importance offshore Brazil
by Jeremy Cresswell, contributing editor

 COMPLETIONS

Innovations filling in technology gaps in deepwater Gulf of Mexico completions
by Katie Mazerov, contributing editor

 Health, Safety & environment

Drilling industry must match environmental culture to safety culture
by Claus V Hemmingsen, Maersk Drilling, IADC 2009 CHAIRMAN
People and the environment: Operator implements system to manage fluids selection
by Reagan James, ConocoPhillips Scandinavia, et al
Can UBD flaring reduce global CO2 emissions? Possibly
by Dave Elliott, Shell E&P, et al
Low-emissions generator uses catalyst system to reduce NOx
by Ted Christiansen, National Oilwell Varco
Global workforce means culture, language, regional laws are relevant in HSE reporting
by Kinga E Doris, Pride International, et al

 TECHNOLOGY SHOWCASE

Condition-based maintenance could help improve drilling contractors’ equipment reliability, performance
by Karl Faller, TI-Data

 iadc connection

From the chairman: Taking the lead towards better environmental performance
From the president: Promoting dialogue on asset integrity challenges
SCA Chapter celebrates 10th anniversary
Wirelines
News Cuttings
Conference Calendar

 departments

Drilling Ahead
D&C News
D&C Tech Digest
HSE Corner
People, Companies & Products
Perspectives: Naresh Kumar, Jindal Drilling

FEATURED MICROSITES


Recent Drilling News

  • 26 November 2014

    US EIA: Increase in energy demand requires 33 million bbl/day more oil

    The world is going to need one-third more oil between 2010 and 2040, with developing countries, such as China and India, accounting for a major portion in the increase in...

  • 25 November 2014

    Prescriptive Analytics prescribes how to complete wells to maximize production

    "Big data" is taking on a new role in industry, where companies are combining the findings from geology and geophysics with new data collected from advanced technologies...

  • 25 November 2014

    Petrobras completes drilling first appraisal well in Libra Consortium

    Petrobras recently completed drilling the first appraisal well in the Libra area, the 3-BRSA-1255 (3-RJS-731), known as NW1. Located in the Northwest portion of the Libra block, in the pre-salt layer of the...

  • 24 November 2014

    Ensign secures contracts for 2 ADR 1500S pad drill rigs in Montney area

    Ensign Energy Services has signed contracts for two of its new ADR 1500S pad drill rigs for a major operator in the Montney area of northeast British Columbia...

  • 21 November 2014

    Statoil cancels Stena Carron rig contract offshore Angola

    Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola...

  • Read more news