Archive | Departments

Drilling & Completion News

Posted on 10 November 2009 in 2009, Departments, Global and Regional Markets, November/December

Anadarko Petroleum has announced another successful appraisal well in the West Cape Three Points Block offshore Ghana. The Mahogany-4 well, the eastern-most…

PrintFriendlyShare This

D&C Tech Digest

Posted on 03 November 2009 in 2009, Departments, Innovating While Drilling, July/August

Huisman rig completes 1st well in 6 weeks; drills surface hole using drilling with casing Huisman’s newly developed containerised drilling rig, the LOC 400, operated by the Northern Dutch Drilling Company (NDDC) for Northern Petroleum Netherlands (NPN), successfully completed its first well in Werkendam, The Netherlands. The unit drilled the well to a TD of […]

D&C News

Posted on 03 November 2009 in 2009, Departments, July/August, News

Jackup delivered to China Oilfield Services Keppel FELS delivered the new jackup COSLSTRIKE to China Oilfield Services Limited (COSL) ahead of schedule and with a clean safety record. It is the third of three KFELS B Class jackup rigs commissioned by Awilco Offshore ASA prior to COSL’s acquisition. The first two rigs were delivered in […]

Pushing for innovations in a risk-averse industry

Posted on 02 November 2009 in 2009, Departments, September/October

For many petroleum engineers who end up building their careers on the drilling side of the business, one common theme often appears: Production is boring.

People, Companies & Products

Posted on 02 November 2009 in 2009, Departments, September/October

Transocean announced that Steven L Newman has been chosen to succeed Robert L Long as the company’s chief executive officer upon Mr Long’s…

Pride underscores training, safety commitment with new facility in France featuring rig, test well

Posted on 02 November 2009 in 2009, Departments, Drilling It Safely, September/October

Pride International’s commitment to training runs deep, a company culture in a land where learning runs back through the centuries. In the land…

D&C Tech Digest

Posted on 02 November 2009 in 2009, Departments, Innovating While Drilling, September/October, The Efficient Rig

Weatherford International and ENI have entered an agreement to develop a subsea drilling-with-casing system. It will enable a 20-in. casing string…

D&C News

Posted on 02 November 2009 in 2009, Departments, September/October

Anadarko Petroleum announced in late July a discovery at the Vito exploration well in Mississippi Canyon block 984. The well encountered more than…

Requiem for a Recession: The Good, the Bad & the Ugly

Posted on 02 November 2009 in 2009, Departments, September/October

Signs are increasingly positive for the overall economy, but the energy outlook is a case of the Good, the Bad and the Ugly.

D&C Tech Digest

Posted on 30 October 2009 in 2008, Departments, September/October

First injection of water achieved in Shell’s Ursa/Princess Waterflood project in GOM Shell announced it has achieved another milestone in the Ursa/Princess Waterflood project. First injection of water occurred on 3 July 2008 and is planned to continue for the next 30 years. With a listed volume enhancement capacity of 30,000 bbl/day of oil equivalent, […]

FEATURED MICROSITES


Recent Drilling News

  • 22 April 2014

    Noble names Steven Manz as Senior VP And CFO of Paragon Offshore

    Steven A. Manz will serve as Senior VP and CFO of Noble Corp’s spinoff company Paragon Offshore, a standard specification offshore drilling company, Noble announced today...

  • 17 April 2014

    Shell makes deepwater gas discovery offshore Malaysia

    Shell has made an exploration discovery offshore Malaysia in the Rosmari-1 well located 135 km offshore Malaysia in Block SK318. The well was drilled to a total depth of 2,123...

  • 16 April 2014

    Maersk Drilling takes delivery of ultra-deepwater drillship

    Maersk Drilling has taken the delivery of its second drillship, Maersk Valiant from the Samsung Heavy Industries (SHI) shipyard in Geoje-Si, South-Korea. Maersk Valiant has begun its voyage toward the...

  • 16 April 2014

    Ensco orders new jackups from Lamprell

    Ensco has ordered two high-specification jackups, ENSCO 140 and ENSCO 141, for delivery in mid-2016 from Lamprell’s shipyard in the United Arab Emirates. The rigs will also...

  • 16 April 2014

    MPD/UBD successfully drills sidetrack after 6 failed conventional drilling attempts

    In the Brookeland Field in East Texas, conventional drilling methods failed in six attempts to drill a “straightforward” horizontal wellbore. The original well had surface casing installed...

  • Read more news