Archive | Departments

Cason Swindle, WCI: Impact of well control performance reverberates around the world

Posted on 11 March 2014 in 2014, Departments, IADC: Global Leadership, Global Challenges, March/April, Videos

By Lauren Wolfson, editorial assistant An ardent lover of the arts and a professional acapella singer, Cason Swindle left his dreams of running an opera company fully behind when he decided to join his father’s training company in Lafayette, La., in 2008. This was not an easy decision, but because he was third-generation oilfield, the move actually […]

PrintFriendlyShare This

Drilling & Completion News

Posted on 03 March 2014 in 2014, Departments, March/April

PEMEX has awarded six-year drilling contracts to Seadrill’s West Oberon, West Intrepid, West Defender and West Courageous jackups. A fifth contract for the Prospector 3…

People, companies and products

Posted on 24 January 2014 in 2014, Departments, January/February

Robert “Bobby” L. Parker Jr has retired from Parker Drilling after 18 years as president and CEO. Over his more than 40 years at the company, Mr Parker spearheaded the development of a strong safety culture…

Drilling & Completion News

Posted on 24 January 2014 in 2014, Departments, January/February

Two new rigs from Latshaw Drilling began operations in December in the Permian Basin. The first is Rig #42 (pictured), a National Oilwell Varco (NOV) Ideal 1,500-hp AC rig with…

Drilling & Completion Tech Digest

Posted on 24 January 2014 in 2014, Departments, January/February

Accurate frac placements cut time on Oklahoma well. The Baker Hughes FracPoint multipoint (MP) system with DirectConnect ports has reduced total frac time on a 4,500-ft…

Marta Lafuente, Vallourec: Industry acceptance of innovation is priceless

Posted on 21 January 2014 in 2014, Departments, January/February

Working in the oil and gas industry was not in Marta Lafuente’s plans when she began her engineering career in France, focusing primarily on steel manufacturing. However…

Drilling Ahead: New initiatives and new look for IADC

Posted on 20 January 2014 in 2014, Departments, IADC: Global Leadership, Global Challenges, January/February

When the American Association of Oilwell Drilling Contractors (AAODC) refreshed its brand in 1972, morphing into IADC, it replaced “American” with “International” and…

Louis Romo, BP: Finding common ground to advance deepwater well control practices

Posted on 05 November 2013 in 2013, Departments, November/December

For Louis Romo, segment technical authority – well control for BP, a career in the oil and gas industry was the result of a series of fortunate but…

Drilling & Completion Tech Digest

Posted on 30 October 2013 in 2013, Departments, November/December

In the Middle East, Petroleum Development Oman (PDO) was experiencing heavy mud losses while drilling a well in an onshore carbonate reservoir…

People, Companies and Products

Posted on 30 October 2013 in 2013, Departments, November/December

Larry Dickerson, president and CEO of Diamond Offshore Drilling, will retire after more than 30 years of service, the company announced…

FEATURED MICROSITES


Recent Drilling News

  • 22 April 2014

    Noble names Steven Manz as Senior VP And CFO of Paragon Offshore

    Steven A. Manz will serve as Senior VP and CFO of Noble Corp’s spinoff company Paragon Offshore, a standard specification offshore drilling company, Noble announced today...

  • 17 April 2014

    Shell makes deepwater gas discovery offshore Malaysia

    Shell has made an exploration discovery offshore Malaysia in the Rosmari-1 well located 135 km offshore Malaysia in Block SK318. The well was drilled to a total depth of 2,123...

  • 16 April 2014

    Maersk Drilling takes delivery of ultra-deepwater drillship

    Maersk Drilling has taken the delivery of its second drillship, Maersk Valiant from the Samsung Heavy Industries (SHI) shipyard in Geoje-Si, South-Korea. Maersk Valiant has begun its voyage toward the...

  • 16 April 2014

    Ensco orders new jackups from Lamprell

    Ensco has ordered two high-specification jackups, ENSCO 140 and ENSCO 141, for delivery in mid-2016 from Lamprell’s shipyard in the United Arab Emirates. The rigs will also...

  • 16 April 2014

    MPD/UBD successfully drills sidetrack after 6 failed conventional drilling attempts

    In the Brookeland Field in East Texas, conventional drilling methods failed in six attempts to drill a “straightforward” horizontal wellbore. The original well had surface casing installed...

  • Read more news