Archive | Departments

Drilling & Completion News

Posted on 17 September 2012 in 2012, Departments, September/October

Petrobras confirmed in August the presence of quality oil and gas in the BM-SEAL-10 block, in ultra-deepwaters in the Sergipe-Alagoas Basin. The block is part of the SEAL-M-499 concession…

PrintFriendlyShare This

Drilling & Completion Tech Digest

Posted on 17 September 2012 in 2012, Departments, September/October

The US Bureau of Safety and Environmental Enforcement (BSEE) completed the first full-scale deployment of critical well control equipment over the summer..

People, Companies & Products

Posted on 16 July 2012 in 2012, Departments, July/August

Mærsk Mc-Kinney Møller, a businessman and philanthropist whose business spanned multiple continents and industries, from Europe to North America, from the airline industry to oil and gas, died 16 April in Copenhagen at the age of 98…

Drilling & Completion News

Posted on 16 July 2012 in 2012, Departments, July/August

A Central Gulf of Mexico oil and gas lease sale held in June attracted more than $1.7 billion in high bids for tracts on the US Outer Continental Shelf (OCS) offshore Louisiana, Mississippi and Alabama. A total of 56 offshore energy companies submitted 593 bids on 454 tracts covering more than 2.4 billion acres, the US Interior Department announced…

News Cuttings

Posted on 02 July 2012 in 2012, Departments, July/August

Approximately 400 IADC members and guests attended the IADC North Sea Chapter (NSC) annual safety awards dinner in Aberdeen on 11 May, celebrating what has been one of the safest years on record for offshore drilling contractors…

Are we laggards in technology adoption?

Posted on 24 April 2012 in 2012, Departments, IADC: Global Leadership, Global Challenges, May/June

By Mike Killalea, editor & publisher We pride ourselves on innovation, but are actually laggards at technology adoption. “The oil and gas industry tends to have a technology adoption cycle of roughly 30 years from concept to 50% market penetration,” remarked Dustin Torkay, Seadrill, IADC Advanced Rig Technology (ART) Committee vice chairman-Future Technology, adding that […]

Drilling & Completion News

Posted on 24 April 2012 in 2012, Departments, May/June

Latshaw Drilling Co recently added Rig 18 to its fleet. The rig is a 1,700-hp diesel-electric/SCR rig with a 500-ton AC top drive unit and is skiddable for multiwell pad drilling…

News Cuttings

Posted on 19 April 2012 in 2012, Departments, May/June

Brian Maness, Diamond Offshore Drilling, and Goran Andersson, Chevron, were honored on 7 March…

HSE&T Corner: Security programs must incorporate terrorism prevention, crisis management

Posted on 19 April 2012 in 2012, Departments, Drilling It Safely, May/June

History has shown we cannot prevent terrorist acts from occurring. However, we can minimize the destruction…

Drilling Ahead: ‘Interesting times’ well met by IADC leaders

Posted on 15 March 2012 in 2012, Departments, IADC: Global Leadership, Global Challenges, March/April

It’s with mixed feelings that I write this column, fondly and sadly bidding farewell to my longtime boss and friend Dr Lee Hunt, while welcoming with cheery anticipation his successor Stephen Colville. Lee has served this industry as IADC president since 1990, and as an IADC staffer for six years prior. I’ve had the honor and pleasure to work with Lee for more than 21 years…

FEATURED MICROSITES


Recent Drilling News

  • 31 October 2014

    Japan Drilling to operate new jackup under construction at Keppel

    The KFELS Super B Class design has a drilling depth of 35,000 ft. The rig's leg structure is designed to provide enhanced robustness for operations at 400 ft water depth...

  • 29 October 2014

    New intelligent water management solution based on oxidizer technology

    Nalco Champion has launched the RenewIQ line of oilfield water reuse solutions to help operators reduce freshwater consumption and associated handling costs...

  • 29 October 2014

    Baker Hughes launches all-electric intelligent well system

    Baker Hughes has commercially released its MultiNode all-electric intelligent well system. It allows operators to remotely monitor and control a greater number of production zones...

  • 29 October 2014

    Tercel collaborates with TOTAL to design MicroCORE PDC drill bit

    Tercel Oilfield Products has launched the MicroCORE cutting system at the 2014 SPE Annual Technical Conference and Exhibition in Amsterdam. The MicroCORE cutting...

  • 28 October 2014

    First extension well in pre-salt Libra leads to oil discovery

    The Libra consortium announced that the drilling of the first extension well in the Libra area, known as 3-BRSA-1255-RJS (3-RJS-731), has proven the discovery of high-quality oil...

  • Read more news