Archive | Drilling It Safely

An introduction to relief well planning, dynamic kill design: recognizing the common limitations

Posted on 08 November 2010 in 2010, Drilling It Safely, November/December

The recent Macondo well control event in the Gulf of Mexico has created considerable interest in relief wells and dynamic kill designs in terms of contingency planning…

PrintFriendlyShare This

Comments (1)

Safety enhanced in NOV’s ST-120 iron roughneck

Posted on 15 October 2010 in Drilling It Safely, Drilling Rigs & Automation, News, Videos

Drilling Contractor attended a demonstration of National Oilwell Varco’s (NOV) ST-120 iron roughneck at one of its Houston manufacturing facilities…

Comments (1)

HSE Corner: Behavior management: next step change in safety

Posted on 08 September 2010 in 2010, Departments, Drilling It Safely, September/October

Before we explain what “behavior-based safety” is in today’s oil and gas industry, let’s first ask ourselves: What is behavior management?

Comments (0)

Contractor, vendor team up to improve training, fall protection, strength of derrick-riding basket

Posted on 08 September 2010 in 2010, Drilling It Safely, Drilling Rigs & Automation, September/October, Videos

Collaboration is a beautiful thing, especially when it extends beyond the parties involved to create a standard of practice for a safer workplace…

Comments (0)

HSE Corner: Taking lessons in standardization, discipline from fighter pilot training to offshore drilling

Posted on 14 July 2010 in Departments, Drilling It Safely, July/August

Our industry has come a long way in developing safe and efficient training. However, Brian “Bru” Brurud developed a new spin on the subject…

Comments (0)

Global drilling industry pushes LTI rate down to record-low 0.37 while fatalities remain same

Posted on 14 July 2010 in Drilling It Safely, July/August

The lost-time Incident (LTI) rate for the global drilling industry reached a record low of 0.37 in 2009 – a 25% reduction from the 0.49 rate in 2008…

Comments (1)

Simulators create immersive role-playing environments for team-based lifting training

Posted on 14 July 2010 in Drilling It Safely, July/August

Over the past 10 years, most fatal work accidents on offshore oil and gas structures have involved the use of lifting equipment. The central causal factors are human error. In particular…

Comments (0)

Lift plans must tackle key questions of risk, responsibility, crew understanding, equipment

Posted on 14 July 2010 in Drilling It Safely, July/August

A lifting operation should be a well thought-out process – careful planning and assessment are required to ensure it is conducted safely and effectively. Several key…

Comments (0)

Environmental benefits may outweigh higher initial costs for readily biodegradable lubricants

Posted on 14 July 2010 in Drilling It Safely, July/August

Diamond Offshore Drilling has worked with Ohio-based Terresolve Technologies to replace the petroleum lubricants used on Diamond’s rigs with readily biodegradable fluids where…

Comments (1)

4 steps to assess, avoid musculoskeletal injury

Posted on 30 April 2010 in 2010, Departments, Drilling It Safely, May/June

Safety is an ongoing concern for our industry. From fire-resistant suits to protective eyewear and headgear, rig crews have access to a plethora of external protective equipment safety…

Comments (0)

FEATURED MICROSITES