Archive | Innovating While Drilling

Stick-slip workshop highlights mitigation technologies, needs

Posted on 23 March 2011 in 2011, Innovating While Drilling, March/April

This article presents the results from a workshop on stick-slip mitigation held in Houston on 15 July 2010…

PrintFriendlyShare This

Comments (0)

Remote workflows put digital resources to work to reduce NPT

Posted on 23 March 2011 in 2011, Innovating While Drilling, March/April

One of the biggest economic challenges for an operator when drilling a well is to reduce nonproductive time (NPT)…

Comments (0)

Longer, deviated wells push drill pipe limits

Posted on 23 March 2011 in 2011, Innovating While Drilling, March/April

Drill pipe technical performance is rarely the starting point for well planning – engineers expect that drill pipe will handle the challenges, loads and environments that it…

Comments (3)

2-in-1 bit: Dual cutting structure boosts ROP

Posted on 23 March 2011 in 2011, Innovating While Drilling, March/April

Drilling at a high penetration rate while maintaining durability to complete abrasive sand sections in the Riverside field of Pinedale, Wyo., has been a challenge…

Comments (0)

Managing kick/loss cycles in East Java

Posted on 23 March 2011 in 2011, Innovating While Drilling, March/April

Dealing with extreme kick/loss cycles is a given in the vuggy, fractured limestone of East Java’s Kujung formation. The difficult drilling is further complicated by reservoir gas with…

Comments (0)

Minimizing uncertainty: Geosteering advances keep wellbores in sweet spot

Posted on 21 March 2011 in 2011, Features, Innovating While Drilling, March/April, Videos

Deviated, ultra-deep and unconventional have become bywords of the complex and complicated nature of oil and gas drilling today. Underlying this new vernacular is another challenge…

Comments (1)

UBD unlocks pay in North Sea wells

Posted on 21 March 2011 in 2011, Features, Innovating While Drilling, March/April

This article reviews an offshore underbalanced drilling project in the Danish sector of the North Sea undertaken during summer 2010. Two oil wells were drilled from a jackup, with produced oil and gas transferred to the accompanying…

Comments (0)

Quantitative ranking system links fracturing fluid performance with environmental stewardship

Posted on 15 December 2010 in Drilling It Safely, Innovating While Drilling, News, Videos

By qualifying fracturing systems and additives through a recognized third-party chemical evaluation process…

Comments (0)

Advances in high-performance drilling fluids enhance wellbore strength, help curb loss

Posted on 13 July 2010 in Innovating While Drilling, July/August

Operators and service companies are developing new advances in high-performance drilling fluids and techniques in order to enhance wellbore strength and mitigate…

Comments (5)

Ultra-large diameter bit designed for GOM salt sections through cutting-structure solutions

Posted on 13 July 2010 in Innovating While Drilling, July/August

Salt formations present unique drilling challenges relative to other formation types of comparable compressive strength and abrasivity. Due to its properties, many…

Comments (0)

FEATURED MICROSITES