Archive | Featured Microsite Articles



Click the microsite buttons below to begin.

Completing the Well Microsite - DrillingContractor.org
Drilling It Safely Microsite - DrillingContractor.org
Global & Regional Markets Microsite - DrillingContractor.org
IADC: Global Leadership Microsite - DrillingContractor.org
Innovating While Drilling™ Microsite - DrillingContractor.org
Onshore Advances Microsite - DrillingContractor.org
The Efficient Rig Microsite - DrillingContractor.org
Offshore Frontier Microsite - DrillingContractor.org

Drilling & Completion News

Posted on 17 September 2012 in 2012, Departments, September/October

Petrobras confirmed in August the presence of quality oil and gas in the BM-SEAL-10 block, in ultra-deepwaters in the Sergipe-Alagoas Basin. The block is part of the SEAL-M-499 concession…

PrintFriendlyShare This

Comments (0)

Drilling & Completion Tech Digest

Posted on 17 September 2012 in 2012, Departments, September/October

The US Bureau of Safety and Environmental Enforcement (BSEE) completed the first full-scale deployment of critical well control equipment over the summer..

Comments (0)

DEA 164: What does a next-gen ranging MWD look like?

Posted on 17 September 2012 in 2012, Innovating While Drilling, September/October

The Drilling Engineering Association (DEA) continues to serve the industry as a key forum for learning about cutting-edge technologies and for forging alliances through joint…

Comments (0)

Industry delves deeper into African frontier

Posted on 17 September 2012 in 2012, Drilling It Safely, Features, Global and Regional Markets, September/October, The Offshore Frontier

On the world map, Africa commands a grand presence, with more than 50 countries that straddle a multitude of climates, terrains and cultures. Into the continent’s vast lands and open waters, the drilling industry continues cautiously to navigate and integrate its activity…

Comments (0)

BOP testing facility focuses on robustness, reliability of components

Posted on 17 September 2012 in 2012, Innovating While Drilling, September/October

As the industry continues to place new rigs into the market, the rippling effects on demand for BOPs and improved BOP technologies parallel the upward trend…

Comments (0)

Hydraulic tensioning takes variance out of BOP installations

Posted on 17 September 2012 in 2012, Drilling It Safely, Exclusive Video, September/October, Videos

Using such conventional methods to make flange connections in the field, especially to BOP installations, can be prone to safety risks – pinch points for fingers and hands, swinging hammers…

Comments (0)

Automated rig built to enable operator’s ‘hands off’ philosophy

Posted on 17 September 2012 in 2012, Innovating While Drilling, Onshore Advances, September/October

n the early 20th century, automation was not widely used in industrial work. This changed in 1947 when General Motors established an automation department…

Comments (0)

‘Rich-burn’ engines look to power land rigs with reduced emissions

Posted on 17 September 2012 in 2012, Global and Regional Markets, Onshore Advances, September/October

Horizontal drilling and hydraulic fracturing have unlocked record supplies of natural gas in North America, pushing prices to a 10-year low and cutting profits for gas…

Comments (0)

Automation: On the cusp of transformation

Posted on 17 September 2012 in 2012, Drilling Rigs & Automation, Features, September/October

After decades of discussion and debate, the industry has reached a tipping point, standing at the brink of what may become the biggest and most sweeping change it has ever faced – automation. No longer a pie-in-the-sky idea, drilling automation is fast becoming reality…

Comments (1)

Upgrades extend drilling capabilities of Beryl platform rigs

Posted on 17 September 2012 in 2012, Global and Regional Markets, September/October, The Offshore Frontier

The Beryl field, located about 200 miles northeast of Aberdeen, is located in a water depth of 390 ft. Its discovery in 1972 led to the installation of the Beryl Alpha platform…

Comments (0)

FEATURED MICROSITES


Recent Drilling News

  • 26 November 2014

    US EIA: Increase in energy demand requires 33 million bbl/day more oil

    The world is going to need one-third more oil between 2010 and 2040, with developing countries, such as China and India, accounting for a major portion in the increase in...

  • 25 November 2014

    Prescriptive Analytics prescribes how to complete wells to maximize production

    "Big data" is taking on a new role in industry, where companies are combining the findings from geology and geophysics with new data collected from advanced technologies...

  • 25 November 2014

    Petrobras completes drilling first appraisal well in Libra Consortium

    Petrobras recently completed drilling the first appraisal well in the Libra area, the 3-BRSA-1255 (3-RJS-731), known as NW1. Located in the Northwest portion of the Libra block, in the pre-salt layer of the...

  • 24 November 2014

    Ensign secures contracts for 2 ADR 1500S pad drill rigs in Montney area

    Ensign Energy Services has signed contracts for two of its new ADR 1500S pad drill rigs for a major operator in the Montney area of northeast British Columbia...

  • 21 November 2014

    Statoil cancels Stena Carron rig contract offshore Angola

    Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola...

  • Read more news