Archive | Featured Microsite Articles



Click the microsite buttons below to begin.

Completing the Well Microsite - DrillingContractor.org
Drilling It Safely Microsite - DrillingContractor.org
Global & Regional Markets Microsite - DrillingContractor.org
IADC: Global Leadership Microsite - DrillingContractor.org
Innovating While Drilling™ Microsite - DrillingContractor.org
Onshore Advances Microsite - DrillingContractor.org
The Efficient Rig Microsite - DrillingContractor.org
Offshore Frontier Microsite - DrillingContractor.org

Case study: Algerian underground blowout

Posted on 16 March 2012 in 2012, Drilling It Safely, March/April

The outcome of a well control and blowout incident reflects how well a crew is trained and prepared. This article will discuss the sequence of a well control operation…

PrintFriendlyShare This

Comments (0)

Study simulates kick responses during MPD

Posted on 16 March 2012 in 2012, Innovating While Drilling, March/April

According to IADC, managed pressure drilling is defined as “an adaptive drilling process used to precisely control the annular pressure profile throughout the wellbore.”…

Comments (0)

Tubular fracturing: Pinpointing the cause

Posted on 16 March 2012 in 2012, Innovating While Drilling, March/April

Brittle fracture of oilfield tubular components can occur due to the material having low fracture toughness – such material often presents low Charpy V-notch impact energy values…

Comments (0)

Reservoir drives choice of RSS vs mud motors

Posted on 16 March 2012 in 2012, Innovating While Drilling, March/April

The ratio of directionally drilled wells to vertically placed wells is increasing. Access to progressively harder to reach reserves is driving more complex well geometries…

Comments (0)

The ABC’s of RFID: physics, oilfield usage

Posted on 16 March 2012 in 2012, Innovating While Drilling, March/April

Non-military application of RFID gained momentum in the last 20 to 30 years as the availability of small, low-cost semiconductors (chips) for the tags became possible…

Comments (2)

Wired pipe delineates safer drilling margins

Posted on 16 March 2012 in 2012, Innovating While Drilling, March/April

In the post-Macondo world, government agencies have promulgated significant new safety standards to ensure the safety of workers, environment and assets…

Comments (0)

Rig design shift would put MPD at the ready

Posted on 16 March 2012 in 2012, Innovating While Drilling, March/April

The rocks being drilled today demand more than a better set of tools; they require a different approach to well construction. That change is occurring in the form of MPD…

Comments (0)

Wirelines

Posted on 15 March 2012 in 2012, IADC: Global Leadership, Global Challenges, March/April

The International Association of Oil & Gas Producers (OGP) has asked the European Commission to look to legislation in the form of a directive that would allow member states to adjust to local circumstances and align with existing regulatory frameworks…

Comments (0)

Niobrara wells prove BHA for coiled tubing

Posted on 15 March 2012 in 2012, Innovating While Drilling, March/April

A recent five-well drilling program in the Niobrara formation along the Colorado-Kansas border has demonstrated a new bottomhole assembly (BHA) for coiled-tubing drilling…

Comments (0)

Riser failure study IDs well control weak links

Posted on 15 March 2012 in 2012, March/April, The Offshore Frontier

A rig is drilling in heavy seas and the station-keeping system fails. The rig starts to drift. The riser emergency disconnect sequence is initiated, but due to a malfunction…

Comments (0)

FEATURED MICROSITES


Recent Drilling News

  • 18 August 2014

    Repsol runs BlueDock connectors in Trinidad and Tobago

    Repsol has recently run BlueDock connectors with elastomeric seals in Trinidad and Tobago. The operation took place in the Arima 2 well on a jackup platform...

  • 15 August 2014

    Joe Hurt to retire from IADC

    After more than 14 years with IADC and a career spanning 42 years, Joe Hurt, Vice President of IADC’s Onshore Division, will retire at the end of August. Mr Hurt began his career in 1974 with Noble Corp, working on land drilling rigs...

  • 13 August 2014

    OneSubsea, Helix and Schlumberger to form subsea well intervention alliance

    OneSubsea, Helix Energy Solutions Group and Schlumberger have entered into a letter of intent to form an alliance to develop technologies and deliver...

  • 12 August 2014

    Noble Energy, Woodside Petroleum sign PSC for exploration offshore Gabon

    Noble Energy has signed a production-sharing contract (PSC) with Gabon government, covering Block F15 in the Gabon Coastal Basin. Under the terms...

  • 12 August 2014

    Opus Offshore selects DTI motion compensation for second set of Chinese drillships

    Drilling Technological Innovations (DTI) has been awarded a contract to provide motion compensation packages for the Tiger III and Tiger IV drillships...

  • Read more news