Archive | Featured Microsite Articles



Click the microsite buttons below to begin.

Completing the Well Microsite - DrillingContractor.org
Drilling It Safely Microsite - DrillingContractor.org
Global & Regional Markets Microsite - DrillingContractor.org
IADC: Global Leadership Microsite - DrillingContractor.org
Innovating While Drilling™ Microsite - DrillingContractor.org
Onshore Advances Microsite - DrillingContractor.org
The Efficient Rig Microsite - DrillingContractor.org
Offshore Frontier Microsite - DrillingContractor.org

Drilling Ahead: Safety – Collaboration, not confrontation

Posted on 16 July 2012 in IADC: Global Leadership, Global Challenges, July/August

Against the changing backdrop of E&P regulation in the post-Macondo world and with shales capturing a skeptical public eye, we must as an industry unite on basic principles of governance and self-regulation. If industry is to sustain its license to drill and produce, it’s critical to collaborate and confront tough realities…

PrintFriendlyShare This

Comments (0)

Drilling & Completion News

Posted on 16 July 2012 in 2012, Departments, July/August

A Central Gulf of Mexico oil and gas lease sale held in June attracted more than $1.7 billion in high bids for tracts on the US Outer Continental Shelf (OCS) offshore Louisiana, Mississippi and Alabama. A total of 56 offshore energy companies submitted 593 bids on 454 tracts covering more than 2.4 billion acres, the US Interior Department announced…

Comments (0)

Raising the bar for global safety, competency

Posted on 16 July 2012 in 2012, Drilling It Safely, Features, IADC: Global Leadership, Global Challenges, July/August

IADC has kicked off an ambitious project to develop worldwide competency guidelines for virtually all rig positions, with a priority on safety-critical positions with well control responsibilities. The guidelines, to be built upon IADC’s Knowledge, Skills and Abilities (KSA) templates, aim to provide tools…

Comments (0)

Low-ECD fluid facilitates deepwater, high-angle GOM well

Posted on 16 July 2012 in 2012, Innovating While Drilling, July/August

Modern wellbore design continues to become more complex. Many wells designed today, especially deepwater wells, contain significant challenges to effective wellbore…

Comments (0)

Dual-gradient system evaluation highlights key high-risk issues

Posted on 16 July 2012 in 2012, Innovating While Drilling, July/August, The Offshore Frontier

This article provides an overview of the studied DGD system and equipment, as well as a hazard identification and risk assessment methodology…

Comments (0)

Advanced oil-based, synthetic muds enable deeper, hotter wells

Posted on 16 July 2012 in 2012, Innovating While Drilling, July/August

Beyond the hardware required for today’s complex wells and state-of-the-art drilling and completion systems, advanced fluid technologies are keeping pace…

Comments (0)

BP case study: MPD application supports HPHT exploration

Posted on 16 July 2012 in 2012, Innovating While Drilling, July/August, The Offshore Frontier

Following successful implementation of managed pressure drilling (MPD) in high-pressure, high-temperature (HPHT) wells drilled from jackups in the Eastern…

Comments (0)

HPHT research heats up

Posted on 16 July 2012 in 2012, Features, Innovating While Drilling, July/August

BP’s Project 20K among industry initiatives to push technologies beyond 20,000 psi, 400°F. What will production in subsea, ultra-deepwater fields look like in 10 years? That’s the multi-billion-dollar question as industry attempts to chart a course for those high stakes-arenas…

Comments (0)

10 tools to build more effective training

Posted on 16 July 2012 in 2012, Drilling It Safely, July/August

In the oil and gas trade, proper safety training can mean the difference between life and death. The goal of every teaching program should be to create training that attracts and retains people’s attention and…

Comments (0)

Collaborative strategy preempts drilling hazards on hard wells

Posted on 16 July 2012 in 2012, Completing the Well, July/August

As industry ventures into more challenging and remote locations to recover oil and gas reserves, a high-quality well architecture is paramount for achieving…

Comments (0)

FEATURED MICROSITES


Recent Drilling News

  • 26 February 2015

    JDC inaugurates Hakuryu 12 jackup, looks to growth in Middle East, Myanmar and Russia

    The Japanese word “hakuryu” means “white dragon.” In Asia, dragons are strongly associated with oceans. They also represent power and blessings...

  • 16 February 2015

    Steven Newman steps down as Transocean President, CEO

    Transocean announced that Steven Newman and the Board of Directors have mutually agreed that he will step down as President and CEO, effective 16 February 2015...

  • 11 February 2015

    Video: WADI program arms young talent with skills to succeed in drilling industry

    As the drilling industry’s aging workforce continues to retire, a new generation of employees is needed to fill vital roles. To address this challenge, IADC’s Workforce...

  • 11 February 2015

    Scandrill’s Scan Vision rig designed with safety, efficiency in mind

    After 22 weeks of construction and a $20 million investment, Scandrill christened the Scan Vision rig on 27 January at the company’s Tyler, Texas, facility...

  • 11 February 2015

    Video: Proper fitness-for-duty evaluations can reduce medical evacuations

    Effective fitness-for-duty evaluations can help reduce the number of medical evacuations from drilling rigs, as a large portion of those evacuations are due to illness...

  • Read more news