Archive | Featured Microsite Articles



Click the microsite buttons below to begin.

Completing the Well Microsite - DrillingContractor.org
Drilling It Safely Microsite - DrillingContractor.org
Global & Regional Markets Microsite - DrillingContractor.org
IADC: Global Leadership Microsite - DrillingContractor.org
Innovating While Drilling™ Microsite - DrillingContractor.org
Onshore Advances Microsite - DrillingContractor.org
The Efficient Rig Microsite - DrillingContractor.org
Offshore Frontier Microsite - DrillingContractor.org

Wired pipe delineates safer drilling margins

Posted on 16 March 2012 in 2012, Innovating While Drilling, March/April

In the post-Macondo world, government agencies have promulgated significant new safety standards to ensure the safety of workers, environment and assets…

PrintFriendlyShare This

Comments (0)

Rig design shift would put MPD at the ready

Posted on 16 March 2012 in 2012, Innovating While Drilling, March/April

The rocks being drilled today demand more than a better set of tools; they require a different approach to well construction. That change is occurring in the form of MPD…

Comments (0)

Wirelines

Posted on 15 March 2012 in 2012, IADC: Global Leadership, Global Challenges, March/April

The International Association of Oil & Gas Producers (OGP) has asked the European Commission to look to legislation in the form of a directive that would allow member states to adjust to local circumstances and align with existing regulatory frameworks…

Comments (0)

Niobrara wells prove BHA for coiled tubing

Posted on 15 March 2012 in 2012, Innovating While Drilling, March/April

A recent five-well drilling program in the Niobrara formation along the Colorado-Kansas border has demonstrated a new bottomhole assembly (BHA) for coiled-tubing drilling…

Comments (0)

Riser failure study IDs well control weak links

Posted on 15 March 2012 in 2012, March/April, The Offshore Frontier

A rig is drilling in heavy seas and the station-keeping system fails. The rig starts to drift. The riser emergency disconnect sequence is initiated, but due to a malfunction…

Comments (0)

Real-time mapping keeps well in reservoir

Posted on 15 March 2012 in 2012, March/April, The Offshore Frontier

An operator planned to drill a horizontal production well in a field offshore Brazil where surface seismic reflection data indicated the target sand reservoirs…

Comments (0)

People, infrastructure challenge Brazil growth

Posted on 15 March 2012 in 2012, Features, Global and Regional Markets, March/April

The offshore drilling industry has seen exponential activity growth in Brazil, and it’s all about deepwater and the pre-salt. In particularly high demand is rig equipment that can go deeper…

Comments (0)

CT finds niches in data retrieval, plug drill-out

Posted on 15 March 2012 in 2012, Drilling Rigs & Automation, Features, March/April

As one of the oilfield’s most flexible and versatile workhorses, coiled tubing continues to push the technology envelope with new applications in more sophisticated operations…

Comments (0)

Self-removing EFDAs level stimulation access

Posted on 15 March 2012 in 2012, Completing the Well, March/April

The industry has made great strides to improve the well completion phase of today’s producing oil and gas wells. What used to be considered a unique operation has been…

Comments (0)

Drilling Ahead: ‘Interesting times’ well met by IADC leaders

Posted on 15 March 2012 in 2012, Departments, IADC: Global Leadership, Global Challenges, March/April

It’s with mixed feelings that I write this column, fondly and sadly bidding farewell to my longtime boss and friend Dr Lee Hunt, while welcoming with cheery anticipation his successor Stephen Colville. Lee has served this industry as IADC president since 1990, and as an IADC staffer for six years prior. I’ve had the honor and pleasure to work with Lee for more than 21 years…

Comments (0)

FEATURED MICROSITES


Recent Drilling News

  • 29 January 2015

    PetroQuip deploys BigFoot toe sleeve in Anadarko Basin

    PetroQuip Energy Services successfully implemented its revolutionary toe sleeve, BigFoot, in a recent horizontal completion for an independent operator...

  • 28 January 2015

    Chevron collaborating with BP, ConocoPhillips to explore 24 leases in deepwater Gulf of Mexico

    Chevron will collaborate with BP and ConocoPhillips to explore and appraise 24 jointly-held offshore leases in the northwest portion of Keathley Canyon...

  • 28 January 2015

    BP forms alliance to advance Paleogene discoveries in deepwater Gulf of Mexico

    BP has formed a new ownership and operating model with Chevron and ConocoPhillips to focus on moving two significant BP Paleogene discoveries closer to development...

  • 27 January 2015

    US EIA: Lower 48 oil production outlook stable despite expected rig count reduction

    The sharp decline in oil prices over Q4 2014, which has continued in January, is already having a significant effect on drilling activity in the US, according...

  • 27 January 2015

    Hess announces 2015 capital, exploratory budget

    Hess Corp announced a 2015 capital and exploratory budget of $4.7 billion, a 16% reduction from its 2014 actual spend of $5.6 billion. Of this, $2.1 billion (45%) is budgeted for unconventional shale resources...

  • Read more news