Archive | Featured Microsite Articles



Click the microsite buttons below to begin.

Completing the Well Microsite - DrillingContractor.org
Drilling It Safely Microsite - DrillingContractor.org
Global & Regional Markets Microsite - DrillingContractor.org
IADC: Global Leadership Microsite - DrillingContractor.org
Innovating While Drilling™ Microsite - DrillingContractor.org
Onshore Advances Microsite - DrillingContractor.org
The Efficient Rig Microsite - DrillingContractor.org
Offshore Frontier Microsite - DrillingContractor.org

News Cuttings

Posted on 04 May 2011 in 2011, IADC: Global Leadership, Global Challenges, May/June

The IADC Contracts Committee has begun a thorough review of the IADC Offshore Daywork Drilling Contract – US in view of new regulatory requirements and operating practices in the Gulf of Mexico…

PrintFriendlyShare This

Comments (0)

Plume modeling study quantifies risk of H2S release in exploration drilling

Posted on 04 May 2011 in 2011, Departments, May/June

With the increasing likelihood of exploration wells being located near population centers in the Middle East and elsewhere, an evaluation of the risk of an uncontrolled release of toxic gas reaching such a settlement needs to be quantified…

Comments (0)

People, Companies & Products

Posted on 04 May 2011 in 2011, Departments, May/June

J Kent Wells will become president and CEO of MDU Resources Group’s natural gas and oil production business, Fidelity E&P…

Comments (0)

Drilling & Completion Tech Digest

Posted on 04 May 2011 in 2011, Departments, May/June

Transocean’s ultra-deepwater drillship Dhirubhai Deepwater KG2 has set what the company believes is a world record for the deepest water depth by an offshore drilling rig of 10,194 ft while working for Reliance Industries offshore India…

Comments (0)

Perspectives

Posted on 04 May 2011 in 2011, Departments, May/June

In an industry in which technology innovation is paramount, Dr Kristin Falk fits right in. “Developing new technologies and applying them in the field is my passion,…

Comments (0)

Kids find joy in oil and gas

Posted on 04 May 2011 in 2011, Departments, May/June

“I never knew my Barbie came from petroleum,” the little girl wrote in amazed wonder. Likewise, the little boy…

Comments (0)

Hybrid coiled-tubing system offers stimulation option for extended-reach wells

Posted on 12 April 2011 in Drilling Rigs & Automation, News

A new hybrid coiled-tubing (CT) system is enabling the efficient use of CT in extended-reach wells…

Comments (0)

Alpha Star semi delivered to Brazil’s Queiroz Galvão

Posted on 29 March 2011 in Drilling Rigs & Automation, News

Keppel FELS has delivered the Alpha Star, the second of two DSS 38 semisubmersible rigs, to Brazil’s Queiroz Galvão Óleo e Gás (QGOG)…

Comments (0)

Longer, deviated wells push drill pipe limits

Posted on 23 March 2011 in 2011, Innovating While Drilling, March/April

Drill pipe technical performance is rarely the starting point for well planning – engineers expect that drill pipe will handle the challenges, loads and environments that it…

Comments (4)

Stick-slip workshop highlights mitigation technologies, needs

Posted on 23 March 2011 in 2011, Innovating While Drilling, March/April

This article presents the results from a workshop on stick-slip mitigation held in Houston on 15 July 2010…

Comments (0)

FEATURED MICROSITES


Recent Drilling News

  • 29 October 2014

    New intelligent water management solution based on oxidizer technology

    Nalco Champion has launched the RenewIQ line of oilfield water reuse solutions to help operators reduce freshwater consumption and associated handling costs...

  • 29 October 2014

    Baker Hughes launches all-electric intelligent well system

    Baker Hughes has commercially released its MultiNode all-electric intelligent well system. It allows operators to remotely monitor and control a greater number of production zones...

  • 29 October 2014

    Tercel collaborates with TOTAL to design MicroCORE PDC drill bit

    Tercel Oilfield Products has launched the MicroCORE cutting system at the 2014 SPE Annual Technical Conference and Exhibition in Amsterdam. The MicroCORE cutting...

  • 28 October 2014

    First extension well in pre-salt Libra leads to oil discovery

    The Libra consortium announced that the drilling of the first extension well in the Libra area, known as 3-BRSA-1255-RJS (3-RJS-731), has proven the discovery of high-quality oil...

  • 28 October 2014

    Schlumberger introduces new well integrity service

    Schlumberger has launched its Invizion Evaluation well integrity service. It helps operators to evaluate zonal isolation by using integrated drilling, cementing and well logging data...

  • Read more news