Archive | Featured Microsite Articles



Click the microsite buttons below to begin.

Completing the Well Microsite - DrillingContractor.org
Drilling It Safely Microsite - DrillingContractor.org
Global & Regional Markets Microsite - DrillingContractor.org
IADC: Global Leadership Microsite - DrillingContractor.org
Innovating While Drilling™ Microsite - DrillingContractor.org
Onshore Advances Microsite - DrillingContractor.org
The Efficient Rig Microsite - DrillingContractor.org
Offshore Frontier Microsite - DrillingContractor.org

ADCO develops high-profile HSE visits as efficient tool to demonstrate management commitment

Posted on 02 November 2009 in 2009, Global and Regional Markets, September/October

As a result of the significant efforts being undertaken by Abu Dhabi Company for Onshore Oil Operations (ADCO) drilling division and its contractors to…

PrintFriendlyShare This

Comments (2)

IADC Incident Statistics Program shows industry set record-low LTI rate in ’08, but fatalities go up

Posted on 02 November 2009 in 2009, Drilling It Safely, September/October

Good news: The global drilling industry pushed its lost-time incident (LTI) rate to a record low of 0.49 in 2008. Not-so-good news: The number of fatalities…

Comments (2)

IADC enhances accreditation, operations initiatives to support Middle East HSE, training, drilling

Posted on 02 November 2009 in 2009, Global and Regional Markets, September/October

For more than a decade, IADC has maintained a strong presence in the Middle East. Not satisfied with past successes, however, the association and its members…

Comments (0)

Hybrid heave drilling technology reduces emissions, operating costs for offshore drilling

Posted on 02 November 2009 in 2009, September/October, The Efficient Rig

Many electro-mechanical cyclical processes could potentially benefit from the use of an energy storage system able to absorb, store and relinquish large amounts of energy…

Comments (0)

Direct-drive top drive designed to eliminate failures, downtime related to gearbox, motor

Posted on 02 November 2009 in 2009, September/October, The Efficient Rig

The top drive has become one of the biggest breakthroughs in drilling technology since it was first commercialised in the 1970s. Its advent brought vast time…

Comments (2)

Two-in-one rotary drilling/coiled-tubing rig enhances performance for Permian Basin wells

Posted on 02 November 2009 in 2009, September/October, The Efficient Rig

Wells have been drilled in the Permian Basin since 1920 and continues today. For a drilling campaign in 2008, one producer sought to improve drilling rates…

Comments (2)

Suzanne Browne, ENSCO: There’s no substitute for the drilling contracting business

Posted on 30 October 2009 in 2008, IADC: Global Leadership, Global Challenges, September/October

In a way, Suzanne Browne, a senior account manager with ENSCO Offshore, grew up around the oil industry. She was raised in Tulsa, Okla., when it was still a big oilfield town. And her mother worked for Gulf Oil (now Chevron) for more than 30 years in the downstream segment. Her mother’s successful career left […]

Comments (0)

People, Companies & Products

Posted on 30 October 2009 in 2008, Focused Microsites, September/October

John Rynd appointed CEO, president of Hercules Offshore Hercules Offshore has appointed John T Rynd as the company’s chief executive officer and president, succeeding Randall D Stilley, who has resigned as CEO, president and a director. Mr Rynd also has been appointed as a director. He has served as executive vice president and chief operating […]

Comments (0)

NOV expands Technical College with Houston facility

Posted on 30 October 2009 in 2008, Drilling It Safely, September/October

As of Q2 2008, National Oilwell Varco (NOV) was reporting a $10.8 billion backlog in capital equipment orders for its rig technology segment. Considering that more than 170 offshore drilling rigs are under construction worldwide, that backlog may not seem like such a surprising number. Still, it undoubtedly demonstrates the level of demand manufacturers and […]

Comments (1)

D&C Tech Digest

Posted on 30 October 2009 in 2008, Departments, September/October

First injection of water achieved in Shell’s Ursa/Princess Waterflood project in GOM Shell announced it has achieved another milestone in the Ursa/Princess Waterflood project. First injection of water occurred on 3 July 2008 and is planned to continue for the next 30 years. With a listed volume enhancement capacity of 30,000 bbl/day of oil equivalent, […]

Comments (0)

FEATURED MICROSITES


Recent Drilling News

  • 23 July 2014

    Halliburton promotes Jeff Miller to President

    Halliburton has promoted Jeff Miller to President and has appointed him to the Halliburton Board of Directors effective 1 August 2014. Mr Miller is currently the...

  • 23 July 2014

    Statoil resumes production on Njord A platform

    Statoil has resumed oil and gas production on the Njord A platform in the Norwegian Sea, after a major reinforcement of the platform structure. Production had been shut down...

  • 22 July 2014

    Petrobras’ domestic oil production tops 2 million bbl/day in June

    Petrobras’ June oil production in Brazil averaged 2 million bbl/day (bpd), a 1.7% increase from May’s production of 1.9 million bpd. In addition, the production operated...

  • 22 July 2014

    Precision, Schlumberger partner to boost industrialization of North American unconventional drilling

    Precision Drilling has entered into a strategic technology and service agreement and marketing alliance with Schlumberger. Utilizing Precision’s Tier 1 drilling rigs and...

  • 22 July 2014

    Easternwell to manage delivery of onshore servicing rig for Brunei

    Australia’s Easternwell, a subsidiary of Transfield Services, has expanded internationally through an agreement with Flux O.S. SDN BHD (Flux), a Bruneian oil and gas company...

  • Read more news