Archive | Featured Microsite Articles



Click the microsite buttons below to begin.

Completing the Well Microsite - DrillingContractor.org
Drilling It Safely Microsite - DrillingContractor.org
Global & Regional Markets Microsite - DrillingContractor.org
IADC: Global Leadership Microsite - DrillingContractor.org
Innovating While Drilling™ Microsite - DrillingContractor.org
Onshore Advances Microsite - DrillingContractor.org
The Efficient Rig Microsite - DrillingContractor.org
Offshore Frontier Microsite - DrillingContractor.org

New liquid microsphere design simplifies HPL cementing, enhances density flexibility

Posted on 03 November 2009 in 2009, Completing the Well, July/August

As wells become increasingly complex, so do the cementing solutions required to support the casing strings and reliably isolate pay zones for long-term…

PrintFriendlyShare This

Comments (0)

Beyond bumping the plug: Wyoming project improves cementing by measuring real value

Posted on 03 November 2009 in 2009, Completing the Well, July/August, Onshore Advances

Although cementing costs typically represent less than 10% of total planned wells costs for US onshore operations, failure to get good zonal isolation…

Comments (0)

Relief well case study: Modified drillers method used as intervention alternative to bullheading

Posted on 03 November 2009 in 2009, Drilling It Safely, July/August

This article summarizes the innovative use of a relief well as a cost-effective and safe alternative for a non-blowout well control intervention.

Comments (0)

Well control faces new complexities with deep, HPHT, horizontal, deepwater, multiwell drilling

Posted on 03 November 2009 in 2009, Drilling It Safely, July/August

There have been many advances in the drilling industry in the last 20 years. What was once the exotic has now become routine. Some examples are:

Comments (2)

Snubbing power tong could be cost-effective alternative to workover rigs while maintaining safety

Posted on 03 November 2009 in 2009, Drilling It Safely, July/August

In oil and gas recovery operations, tubular members are usually run or pulled using a workover rig or a snubbing unit. Workover rigs are basically small…

Comments (0)

Norwegian PSA tracks negative trend in attitudes toward safe lifting, urges radical change

Posted on 03 November 2009 in 2009, Drilling It Safely, Global and Regional Markets, IADC: Global Leadership, Global Challenges, July/August

Change was the winning slogan in the recent US presidential election. In the same way, a willingness to adapt and think anew is essential for reducing risk…

Comments (0)

New water-based drilling fluid with treated micronized barite slurries may help reduce ECDs

Posted on 03 November 2009 in 2009, Innovating While Drilling, July/August

Technical challenges in the oil industry are becoming more complex each day. Ten- to 12-km wells are being drilled, ultra high-temperature, high-pressure…

Comments (1)

Understanding yield point: Effect on pressure surges critical to managing deep, difficult MPD wells

Posted on 03 November 2009 in 2009, Innovating While Drilling, July/August

Managed Pressure Drilling (MPD) is often used to drill formations that have a narrow window between formation pore pressure and fracture pressure.

Comments (0)

Riserless drilling with casing: GOM well design model requires change for deepwater drilling

Posted on 03 November 2009 in 2009, Innovating While Drilling, July/August, The Offshore Frontier

As deepwater Gulf of Mexico (GOM) drilling operations move into deeper water and well depths, there has been a lack of consistent and sustained performance…

Comments (0)

Continuous improvements lead to Maersk Oil Qatar’s longest horizontal well in the world

Posted on 03 November 2009 in 2009, Innovating While Drilling, July/August, The Offshore Frontier

Maersk Oil Qatar AS (MOQ) completed drilling the world-record BD-04A well in May 2008 offshore Qatar. It was the successful outcome of engineering…

Comments (0)

FEATURED MICROSITES


Recent Drilling News

  • 31 October 2014

    Keppel FELS secures contract to build KFELS Super B jackup

    The KFELS Super B Class design has a drilling depth of 35,000 ft. The rig's leg structure is designed to provide enhanced robustness for operations at 400 ft water depth...

  • 29 October 2014

    New intelligent water management solution based on oxidizer technology

    Nalco Champion has launched the RenewIQ line of oilfield water reuse solutions to help operators reduce freshwater consumption and associated handling costs...

  • 29 October 2014

    Baker Hughes launches all-electric intelligent well system

    Baker Hughes has commercially released its MultiNode all-electric intelligent well system. It allows operators to remotely monitor and control a greater number of production zones...

  • 29 October 2014

    Tercel collaborates with TOTAL to design MicroCORE PDC drill bit

    Tercel Oilfield Products has launched the MicroCORE cutting system at the 2014 SPE Annual Technical Conference and Exhibition in Amsterdam. The MicroCORE cutting...

  • 28 October 2014

    First extension well in pre-salt Libra leads to oil discovery

    The Libra consortium announced that the drilling of the first extension well in the Libra area, known as 3-BRSA-1255-RJS (3-RJS-731), has proven the discovery of high-quality oil...

  • Read more news