Archive | Featured Microsite Articles



Click the microsite buttons below to begin.

Completing the Well Microsite - DrillingContractor.org
Drilling It Safely Microsite - DrillingContractor.org
Global & Regional Markets Microsite - DrillingContractor.org
IADC: Global Leadership Microsite - DrillingContractor.org
Innovating While Drilling™ Microsite - DrillingContractor.org
Onshore Advances Microsite - DrillingContractor.org
The Efficient Rig Microsite - DrillingContractor.org
Offshore Frontier Microsite - DrillingContractor.org

New litho neutron density tool features shorter length, wireless capability

Posted on 12 March 2009 in 2009, Innovating While Drilling, March/April

Aside from the GeoTap IDS, two new tools have been added to the InSite suite of technologies from Halliburton’s Sperry Drilling Services…

PrintFriendlyShare This

Comments (0)

Acoustic telemetry, with multiple nodes in drillstring, used to achieve distributed MWD

Posted on 12 March 2009 in 2009, Innovating While Drilling, March/April

Unattended acoustic telemetry in real-time drilling environments can now include multiple nodes in the drillstring. We utilize a primary tool near the drill bit that transmits telemetry and sensor/directional information with one or more acoustic transponding devices at other sites along the drillstring, these incorporating both the primary signal and additional information from their own local sensors…

Comments (0)

Along-string pressure, temperature measurements hold revolutionary promise for downhole management

Posted on 12 March 2009 in 2009, Innovating While Drilling, March/April

It’s widely known that the majority of stuck pipe incidents occur while pulling out of hole. If we can detect where an incident might occur – for example, in a 20,000-ft well – that could mean a radical reduction in nonproductive time (NPT) related to wellbore stability or drillstring integrity…

Comments (0)

High-strength, thin-wall, all-steel drill pipe may provide solution for ultra-extended-reach wells

Posted on 12 March 2009 in 2009, Innovating While Drilling, March/April

In planning for ultra-extended-reach (uER) wells, projected torque & drag (T&D) loads exceed the capabilities of existing high-strength drill pipe. As operators continue to evaluate uER well options, they have been forced to consider using non-steel drill pipe materials (such as aluminum, titanium, composite or other) for reduced surface loads…

Comments (0)

Lightweight, ultra-high-strength drill pipe may meet demands of ERD, critical deep drilling

Posted on 12 March 2009 in 2009, Innovating While Drilling, March/April

Current and future extended-reach drilling (ERD) and other critical projects exceed the capabilities of conventional steel S-135 drillstring assemblies…

Comments (1)

Company taking aerospace alloys to oil/gas

Posted on 12 March 2009 in 2009, Innovating While Drilling, March/April

It’s estimated that less than 1% of the oil and gas market uses aluminum drill pipe (Al DP). Although there are many claimed benefits – primarily its lighter weight vs steel – the higher costs involved have generally confined the pipe to niche applications…

Comments (0)

Review & update: Expandable technologies gain traction through accumulated experience

Posted on 12 March 2009 in 2009, Completing the Well, March/April

As expandable technology matures, it has become a larger part of the wellbore construction toolbox. Operators no longer see expandables as problem-solving contingency tools, in part because of service companies’ aggressive development…

Comments (0)

Innovative, application-specific drill bit designs prove value, help operators set drilling records

Posted on 12 March 2009 in 2009, Innovating While Drilling, March/April

A well is successful as a result of a drill bit with the correct configuration and hydraulic performance for the particular application. Designing the wrong elements can lead to low penetration rates, inefficient hydraulics for hole cleaning, and wellbores that may not reach the operator’s objective…

Comments (1)

Maersk Drilling launches Green Rig project

Posted on 12 March 2009 in 2009, Drilling It Safely, March/April

In the A.P. Moller – Maersk Group, the environmental strategic ambition is to pursue energy efficiency in daily operations, across all business units…

Comments (0)

Drilling Ahead

Posted on 17 January 2009 in 2009, Departments, January/February

This is the downturn everyone expected. They just didn’t expect it so soon. Anyone with a sense of history of the oil and gas business is wise to the reality that a ceaseless upward cycle just is not in the cards. The cards always come tumbling down…

Comments (0)

FEATURED MICROSITES


Recent Drilling News

  • 15 September 2014

    US Treasury announces expanded sanctions with Russian companies

    US Treasury Secretary Jacob J. Lew has announced that persons operating within Russia’s defense and related materiel sector may now be subject to targeted sanctions…

  • 11 September 2014

    Cameron elects Scott Rowe as President and COO

    Scott Rowe will assume the newly created position of President and COO of Cameron, effective 1 October 2014. In his new role, he will report directly to Jack Moore, Chairman and CEO of the company...

  • 11 September 2014

    Statoil, GE and Ferus Natural Gas Fuels expand flare gas solution in Bakken

    A joint venture of GE and Ferus Natural Gas Fuels (Ferus NGF), along with Statoil plan to expand a pilot project to capture flare gas and use it to power up to six...

  • 10 September 2014

    6 elements of successful collaboration among NOCs, IOCs, service companies

    The oil and gas landscape is shifting, with the continuing growth of NOCs and the industry going toward unconventional resources and new frontiers…

  • 09 September 2014

    PTTEP: NOCs, IOCs and service companies must combine strengths to overcome challenges

    As assets become more mature and operations become more complex, industry is challenged with finding economical and environmentally friendly operating strategies...

  • Read more news