Exclusive Video: Schlumberger launches high-def imaging-while-drilling service

Posted on 07 October 2013

http://www.drillingcontractor.org/wp-content/uploads/2013/10/video-slb-10072013.flv

 

Schlumberger launched the new MicroScope HD high-definition imaging-while-drilling service at the 2013 ATCE in New Orleans, La. The service provides logging-while-drilling imaging for reservoir description to optimize completions and make certain decisions based on the perforations. It has been used in 45 wells to date. Watch this exclusive video with Gokhan Yarim, VP marketing and technique at Schlumberger, to learn more.

Leave a Reply

*

FEATURED MICROSITES


Recent Drilling News

  • 28 July 2014

    SDI completes 500th MagTraC MWD Ranging project

    Scientific Drilling International (SDI) has completed the 500th MagTraC MWD Ranging project. MagTraC was introduced in 1998 to target challenging applications...

  • 28 July 2014

    Modular offshore rig design reduces deployment costs

    William Jacob Management (WJM) has introduced an offshore rig design that reduces deployment costs and improves speed-to-market for upstream operations. The 3,000-hp...

  • 23 July 2014

    Halliburton promotes Jeff Miller to President

    Halliburton has promoted Jeff Miller to President and has appointed him to the Halliburton Board of Directors effective 1 August 2014. Mr Miller is currently the...

  • 23 July 2014

    Statoil resumes production on Njord A platform

    Statoil has resumed oil and gas production on the Njord A platform in the Norwegian Sea, after a major reinforcement of the platform structure. Production had been shut down...

  • 22 July 2014

    Petrobras’ domestic oil production tops 2 million bbl/day in June

    Petrobras’ June oil production in Brazil averaged 2 million bbl/day (bpd), a 1.7% increase from May’s production of 1.9 million bpd. In addition, the production operated...

  • Read more news