Exclusive video: New composite wireline cable contains seven-conductor electrical core

Posted on 15 May 2013

http://www.drillingcontractor.org/wp-content/uploads/2013/05/video-slb-05132013.flv

Serko Sarian, telemetry and conveyance portfolio manager for Schlumberger, talks with Drilling Contractor associate editor Katherine Scott about the company’s TuffLINE composite wireline cable on the exhibit floor at the 2013 OTC on 6 May in Houston. Developed over five years at the Schlumberger Houston Conveyance and Surface Equipment Center, the cable consists of a seven-conductor electrical core protected by two opposite wound steel armors and engineers out high-tension conveyance limitations.

 

Leave a Reply

*

FEATURED MICROSITES


Recent Drilling News

  • 28 July 2014

    SDI completes 500th MagTraC MWD Ranging project

    Scientific Drilling International (SDI) has completed the 500th MagTraC MWD Ranging project. MagTraC was introduced in 1998 to target challenging applications...

  • 28 July 2014

    Modular offshore rig design reduces deployment costs

    William Jacob Management (WJM) has introduced an offshore rig design that reduces deployment costs and improves speed-to-market for upstream operations. The 3,000-hp...

  • 23 July 2014

    Halliburton promotes Jeff Miller to President

    Halliburton has promoted Jeff Miller to President and has appointed him to the Halliburton Board of Directors effective 1 August 2014. Mr Miller is currently the...

  • 23 July 2014

    Statoil resumes production on Njord A platform

    Statoil has resumed oil and gas production on the Njord A platform in the Norwegian Sea, after a major reinforcement of the platform structure. Production had been shut down...

  • 22 July 2014

    Petrobras’ domestic oil production tops 2 million bbl/day in June

    Petrobras’ June oil production in Brazil averaged 2 million bbl/day (bpd), a 1.7% increase from May’s production of 1.9 million bpd. In addition, the production operated...

  • Read more news