CATEGORIZED | News

Geothermal project targets oilfield co-produced water

Posted on 08 October 2009

 A US Department of Energy (DOE) collaboration aims to generate electricity from a geothermal source stemming from oilfield operations. The DOE’s Office of Fossil Energy (FE) and the Office of Energy Efficiency and Renewable Energy’s (EERE) Geothermal Technologies Program will merge and leverage research capabilities to demonstrate low-temperature geothermal electric power generation systems using co-produced water from oilfield operations at FE’s Rocky Mountain Oilfield Testing Center (RMOTC).

EERE is providing funding for the purchase of a geothermal electricity producing unit from Ormat Technologies. RMOTC will serve as a testing facility for geothermal technologies, while enhancing knowledge sharing between the geothermal and petroleum industries. With a producing oilfield and long-standing expertise with fossil energy, this project provides a unique opportunity for FE to contribute its experience to emerging renewable energy fields.

The system will turn otherwise discarded water into an energy resource. With an estimated 10 barrels of hot water co-produced along with each barrel of oil in the United States, there is significant resource potential for this technology. The electricity produced will be used to power field production equipment.

Operational and performance data for various climate and system configurations will be collected and made available to industry and the public, highlighting the potential of geothermal renewable energy from co-produced water.

1 Comments For This Post

  1. Anna Says:

    Kind Attn: Butch Kamps

    Good day to you, it is my pleasure to contact you.We are very eager to bulild long term business relationship with your esteemed firm.Hence please allow me to introduce our company for you .

    We are the export branch of jingbo pertroleum machinery co.,ltd which is China’s largest and the most qualified well control hose producer .our company passed API Spec Q1 ,API Spec 7K,API Spec 16C & API Spec 16A,API 16D,ISO certificates.

    Main products include:BOP(blowout preventer)hose,flexible choke and killl hose,rotary hose(drilling hose),and hammer unions.

    Many of our products have been exported far to :

    Oman,Dubai,Egypt,Sudan,India,italy,Iran,Kuwait,UAE,Rumania,Switzerland,Australia,USA,Canada,Venezuela,Russia,Uzbekistan,Ethiopia ,Saudia arabia ,singapore,etc. With good function,long service life and precise technical property,our rubber hoses are well received by the customers .

    Should any of the products be of interest to you.please feel free to contact me, i will be very happy to give your more details.

    We appreciated your early reply.

    Sincerely,

    Anna

Leave a Reply

*

FEATURED MICROSITES


Recent Drilling News

  • 22 April 2014

    Noble names Steven Manz as Senior VP And CFO of Paragon Offshore

    Steven A. Manz will serve as Senior VP and CFO of Noble Corp’s spinoff company Paragon Offshore, a standard specification offshore drilling company, Noble announced today...

  • 17 April 2014

    Shell makes deepwater gas discovery offshore Malaysia

    Shell has made an exploration discovery offshore Malaysia in the Rosmari-1 well located 135 km offshore Malaysia in Block SK318. The well was drilled to a total depth of 2,123...

  • 16 April 2014

    Maersk Drilling takes delivery of ultra-deepwater drillship

    Maersk Drilling has taken the delivery of its second drillship, Maersk Valiant from the Samsung Heavy Industries (SHI) shipyard in Geoje-Si, South-Korea. Maersk Valiant has begun its voyage toward the...

  • 16 April 2014

    Ensco orders new jackups from Lamprell

    Ensco has ordered two high-specification jackups, ENSCO 140 and ENSCO 141, for delivery in mid-2016 from Lamprell’s shipyard in the United Arab Emirates. The rigs will also...

  • 16 April 2014

    MPD/UBD successfully drills sidetrack after 6 failed conventional drilling attempts

    In the Brookeland Field in East Texas, conventional drilling methods failed in six attempts to drill a “straightforward” horizontal wellbore. The original well had surface casing installed...

  • Read more news