IADC criticizes BSEE policy for citing drilling contractors

Posted on 23 August 2012

IADC has issued a criticism of the Interim Policy Document issued last week by the US Bureau of Safety and Environmental Enforcement (BSEE). By affirming that BSEE inspectors can issue Incidents of Noncompliance to drilling contractors as well as oil companies, the policy demonstrates a deviation from the global paradigm of holding operators ultimately responsible for accidents at the well site, according to IADC.

“BSEE’s guidance is inconsistent with the industry model and creates a whole new area of ambiguity,” said Brian Petty, IADC executive vice president ­– government affairs. “Global government regimes have always held operators responsible. This new guidance opens the door to unknown levels of liability for contractors and additional uncertainty for contractors. At a minimum it could increase contractors’ insurance premiums, but it also could potentially eliminate coverage for many companies in the US altogether.

IADC is concerned that these additional costs and risk exposure, combined with the possibility for civil penalties and fines, could drive drilling contractors out of the US Gulf of Mexico, where experienced and high-quality drilling contractors are desperately needed. “Drilling activity is strong around the world, with significant rig demand in areas like Brazil, West Africa and Asia Pacific. Drilling contractors could well decide to leave the Gulf for places where they won’t have to bear the same risks,” Mr Petty said.

Leave a Reply

*

FEATURED MICROSITES


Recent Drilling News

  • 26 November 2014

    US EIA: Increase in energy demand requires 33 million bbl/day more oil

    The world is going to need one-third more oil between 2010 and 2040, with developing countries, such as China and India, accounting for a major portion in the increase in...

  • 25 November 2014

    Prescriptive Analytics prescribes how to complete wells to maximize production

    "Big data" is taking on a new role in industry, where companies are combining the findings from geology and geophysics with new data collected from advanced technologies...

  • 25 November 2014

    Petrobras completes drilling first appraisal well in Libra Consortium

    Petrobras recently completed drilling the first appraisal well in the Libra area, the 3-BRSA-1255 (3-RJS-731), known as NW1. Located in the Northwest portion of the Libra block, in the pre-salt layer of the...

  • 24 November 2014

    Ensign secures contracts for 2 ADR 1500S pad drill rigs in Montney area

    Ensign Energy Services has signed contracts for two of its new ADR 1500S pad drill rigs for a major operator in the Montney area of northeast British Columbia...

  • 21 November 2014

    Statoil cancels Stena Carron rig contract offshore Angola

    Statoil has decided to cancel the Stena Carron rig contract after fulfilling the work commitments in the Statoil-operated blocks 38 and 39 in the Kwanza basin offshore Angola...

  • Read more news