Video exclusive: Schlumberger takes integrated strategy to help operators meet well construction goals

Posted on 05 March 2013

http://www.drillingcontractor.org/wp-content/uploads/2013/03/video-slb1-03052013.flv

Steve Orr, president of Schlumberger’s Drilling Group, talks about the company’s integrated approach to products and technologies with Drilling Contractor associate editor Joanne Liou at the 2013 SPE/IADC Drilling Conference & Exhibition in Amsterdam on 5 March. Schlumberger is investing in integration that allows them to model the interdependency of technologies.

Mr Orr is scheduled to participate in the plenary session, “Delivering Wells in a Critical World,” on 6 March with Lyndol Dew, Diamond Offshore Drilling; Rosli Hamzah, PETRONAS; Scott Sigurdson, BP Global Wells Organization; and Øyvind Tuntland, Petroleum Safety Authority.

Read Mr Orr’s Q&A on Critical Issues in Drilling and Completions from the 2013 January/February issue of DC.

Leave a Reply

*

FEATURED MICROSITES


Recent Drilling News

  • 15 April 2015

    DNV unveils Recommended Practice to standardize steel forgings for subsea applications

    Steel forgings are important building blocks for subsea components and are often tailored to meet end-users’ specific requirements. This results in long delivery times...

  • 14 April 2015

    BSEE issues proposed BOP, well control regulations for public comment

    On 13 April, US Secretary of the Interior Sally Jewell announced proposed regulations that call for more...

  • 14 April 2015

    Wood Mackenzie: Deeper cuts may be needed to achieve cash flow neutrality

    The rapid and aggressive response by oil and gas companies to low oil prices has stabilized the sector...

  • 13 April 2015

    UKOG completes Weald Basin PEDL126 acquisition from Magellan

    UK Oil and Gas now holds 100% interest in the Weald Basin onshore license PEDL126 after acquiring...

  • 13 April 2015

    Noble Energy to drill Humpback, Rhea offshore Falkland Islands this year

    Noble Energy has acquired a 75% interest and operatorship of the PL001 license in the North Falkland Basin from...

  • Read more news