Webinar Registration

sponsored-petroskills“How to Build a Performance-Ready Drilling Engineer”

Airing 14 November • Sponsored by PetroSkills

Learn how to accelerate your time to competence for green drilling engineers. “How to Build a Performance-Ready Drilling Engineer,” sponsored by PetroSkills, will explain what a performance-ready technical professional must know in today’s high-activity industry, and best practices to accelerate competency.

This timely webinar will include a practical example of bringing a young engineer up to speed for a specific problem. The scenario includes possible outcomes, risks and avoiding near misses. Competency maps are also tied into the scenario.

The three highly qualified participants are:

  • Ron Hinn, PetroSkills vice president of training;
  • Bruce G Kitchel, chief drilling and completions engineer, Gulf Coast Business Unit, Conoco Phillips
  • James Bobo, ConocoPhillips principal drilling engineer (ret.) and well construction discipline manager, PetroSkills.

Register now for this high-interest webinar, airing Thursday, 14 November. Broadcast times will be staggered to provide the best possible viewing experience.

 

Complete the form below to pre-register and post questions in advance.

 
 

Please fill out this form to register for the webinar.

FEATURED MICROSITES


Recent Drilling News

  • 28 July 2014

    SDI completes 500th MagTraC MWD Ranging project

    Scientific Drilling International (SDI) has completed the 500th MagTraC MWD Ranging project. MagTraC was introduced in 1998 to target challenging applications...

  • 28 July 2014

    Modular offshore rig design reduces deployment costs

    William Jacob Management (WJM) has introduced an offshore rig design that reduces deployment costs and improves speed-to-market for upstream operations. The 3,000-hp...

  • 23 July 2014

    Halliburton promotes Jeff Miller to President

    Halliburton has promoted Jeff Miller to President and has appointed him to the Halliburton Board of Directors effective 1 August 2014. Mr Miller is currently the...

  • 23 July 2014

    Statoil resumes production on Njord A platform

    Statoil has resumed oil and gas production on the Njord A platform in the Norwegian Sea, after a major reinforcement of the platform structure. Production had been shut down...

  • 22 July 2014

    Petrobras’ domestic oil production tops 2 million bbl/day in June

    Petrobras’ June oil production in Brazil averaged 2 million bbl/day (bpd), a 1.7% increase from May’s production of 1.9 million bpd. In addition, the production operated...

  • Read more news