Statoil, ExxonMobil successfully test Zafarani reservoir in Tanzania Block 2

Posted on 03 March 2014

Statoil and co-venturer ExxonMobil announced the results from their first drill stem test in the Tanzania Block 2 offshore discoveries. The data acquired is important to reduce technical uncertainties in a possible future Tanzania offshore and LNG development.

The Zafarani-2 operation tested two separate intervals and flowed at a maximum of 66 million standard cu ft of gas per day, constrained by equipment, and confirmed good reservoir quality and connectivity.

The drill stem test operation was performed through a re-entry in the Zafarani-2 well, in 2,400 m water depth and approximately 80 km off the coast of southern Tanzania.

“The ongoing appraisal program is crucial to firm up the design and development basis for bringing gas to shore and a first phase onshore LNG project in Tanzania,” said Øystein Michelsen, Statoil’s Tanzania Country Manager. “We are now working constructively with our co-venturer ExxonMobil, Blocks 1, 3 and 4 and the Tanzanian authorities to progress the plans for a joint LNG plant development.”

The production well rate potentials are estimated to be higher than the equipment constrained rates obtained during the test. The Zafarani-2 operation will be followed by the appraisal well Zafarani-3, which concludes the planned appraisal in the Zafarani reservoir, the cornerstone for a field development in Tanzania Block 2.

The Zafarani-2 well test announcement follows the Mronge-1 discovery made in December 2013, which was the fifth discovery in Block 2 and brought the natural gas in place volumes up to 17-20 trillion cu ft.

The Mronge-1 was preceded by three successful high-impact gas discoveries during the first drilling phase with Tangawizi-1, Zafarani-1 and Lavani-1, and a deeper discovery in a separate reservoir in Lavani-2.

Statoil operates the license on Block 2 on behalf of Tanzania Petroleum Development Corp (TPDC) and has a 65% working interest, with ExxonMobil Exploration and Production Tanzania holding the remaining 35%.

 

Leave a Reply

*

FEATURED MICROSITES


Recent Drilling News

  • 17 December 2014

    Saudi Aramco: Four factors for a sustainable drilling business

    Despite the modest growth in demand and drop in oil prices today, the long-term outlook for industry is healthy. “Our industry will need to add around 40 million bbl per day for new capacity...

  • 16 December 2014

    Ensco development program produces driller in 3 years

    Ensco’s Accelerated Development Program (ADP) takes a “green” individual and, within a three-year period, trains them to become a driller. In response to personnel shortages in various areas, including drilling...

  • 16 December 2014

    Saudi Aramco: ‘Industry cannot afford to lose talent when the economy is down’

    Industry is facing a human resources challenge in two areas: the ageing workforce and the shortage of skills, Mohammed Al Sellemi...

  • 16 December 2014

    Nanotechnology has potential to improve tool performance in extreme environments

    In terms of temperature stability and corrosion, tools have limitations, especially in extremely challenging drilling environments. Jothibasu Ramasamy...

  • 16 December 2014

    Colville: WCI provides forum to evaluate practical, economical advances in well control practices

    Major players throughout industry are joining forces under the Well Control Institute (WCI). The mandate of WCI is “to provide the definitive forum...

  • Read more news