US Steel Tubular Products to open Innovation & Technology Center for industry customers

Posted on 27 March 2012

By Joanne Liou, editorial coordinator

U.S. Steel Tubular Products (USS) will open the Innovation & Technology Center at its Houston offices on 28 March. The 10,000-sq-ft facility will serve as a training and education facility for customers, stakeholders and the community; it will be open to host events, such as lunch-and-learn sessions, industry association meetings and employee training. The center features six areas of interest devoted to research and development innovations; services and connections; manufacturing; inspection and testing; raw materials; and an overview area showcasing the company’s history.

The six areas reflect the company’s integrated supply chain and vision. “We started this vision of customer-driven tubular focus within our tubular segment,” Douglas R. Matthews, senior vice president – tubular operations of USS, said at a media event last week. “We need to be a stronger supporter – supporting technology developments that help our customers do their job easier, faster, better, cheaper.” The display of artificial iron ore, coke and limestone show the process of selecting and mining the materials. In the manufacturing exhibit, visitors can learn about the process and how materials are refined.

USS’ technologies and services are featured in the products, services and connections area of the center. Some of the company’s latest advances, such as the USS Buttress Thread, are showcased in the R&D innovations area. The interactive inspection and testing exhibit allows guests to test the performance capacity of various products through a touch-screen virtual testing system. Throughout the center, videos, posters and simulations give visitors an in-depth look and understanding of different technologies and process involved within the steel and tube-making process.

“We’re excited about this step in the evolutionary process of being tubular focus and customer driven,” Mr Matthews said. “We’re making sure our customers are at the forefront and identifying what their needs are and being responsive and proactive to supporting those needs, and we feel that this grand opening of our innovation and technology center is a step in that direction.”

Image Gallery

Click any image to zoom

U.S. Steel Media DayU.S. Steel Media DayU.S. Steel Media Day

U.S. Steel Media DayU.S. Steel Media DayU.S. Steel Media Day

U.S. Steel Media DayU.S. Steel Media DayU.S. Steel Media Day

U.S. Steel Media DayU.S. Steel Media DayU.S. Steel Media Day

U.S. Steel Media DayU.S. Steel Media DayU.S. Steel Media Day

U.S. Steel Media DayU.S. Steel Media DayU.S. Steel Media Day

U.S. Steel Media DayU.S. Steel Media DayU.S. Steel Media Day

U.S. Steel Media DayU.S. Steel Media DayU.S. Steel Media Day

1 Comments For This Post

  1. Doug Acomb Says:

    Where in Houston is this facility located?

Leave a Reply

*

FEATURED MICROSITES


Recent Drilling News

  • 22 April 2014

    Noble names Steven Manz as Senior VP And CFO of Paragon Offshore

    Steven A. Manz will serve as Senior VP and CFO of Noble Corp’s spinoff company Paragon Offshore, a standard specification offshore drilling company, Noble announced today...

  • 17 April 2014

    Shell makes deepwater gas discovery offshore Malaysia

    Shell has made an exploration discovery offshore Malaysia in the Rosmari-1 well located 135 km offshore Malaysia in Block SK318. The well was drilled to a total depth of 2,123...

  • 16 April 2014

    Maersk Drilling takes delivery of ultra-deepwater drillship

    Maersk Drilling has taken the delivery of its second drillship, Maersk Valiant from the Samsung Heavy Industries (SHI) shipyard in Geoje-Si, South-Korea. Maersk Valiant has begun its voyage toward the...

  • 16 April 2014

    Ensco orders new jackups from Lamprell

    Ensco has ordered two high-specification jackups, ENSCO 140 and ENSCO 141, for delivery in mid-2016 from Lamprell’s shipyard in the United Arab Emirates. The rigs will also...

  • 16 April 2014

    MPD/UBD successfully drills sidetrack after 6 failed conventional drilling attempts

    In the Brookeland Field in East Texas, conventional drilling methods failed in six attempts to drill a “straightforward” horizontal wellbore. The original well had surface casing installed...

  • Read more news